5
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
1
BOILER
INSTALLATION
1.1 INSTALLATION
RECOMMENDATIONS.
The Magis Hercules ErP boiler is designed
solely for base installations, it is predisposed to
be coupled with a solar panel system and with
the Immergas heat pump.
The electronics allow to manage the three
systems, with which it produces domestic hot
water for household and similar purposes, room
heating and cooling (cooling is performed by the
heat pump only).
In the event the unit is installed in damp places,
one must provide an insulation system under-
neath it, to insulate it from the ground.
The place of installation of the appliance and
relative Immergas accessories must have suitable
features (technical and structural) such to allow
(always in safety, efficiency and comfortable
conditions):
- installation (according to the provisions of the
technical legislation and technical regulations);
- maintenance operations (including scheduled,
periodic, routine and special maintenance);
- removal (to outdoors in the place for loading
and transporting the appliances and compo-
nents) as well as their eventual replacement
with appliances and/or equivalent components.
By varying the type of installation the classifica-
tion of the boiler also varies, precisely:
-
Type B
23
or B
53 boiler
if installed using the rel-
evant terminal for air intake directly from the
room in which the boiler has been installed.
-
Type C boiler
if installed using concentric
pipes or other types of pipes envisioned for
sealed chamber boilers for air intake and expul-
sion of flue gases.
Note:
appliance classification is provided in the
depictions of the various installation solutions
shown on the following pages.
Only professionally enabled companies are
authorised to install Immergas gas appliances.
Installation must be carried out according to
regulation standards, current legislation and in
compliance with local technical regulations and
the required technical procedures.
Before installing the appliance, ensure that it is
delivered in perfect condition; if in doubt, contact
the supplier immediately. Packing materials (sta-
ples, nails, plastic bags, polystyrene foam, etc.)
constitute a hazard and must be kept out of the
reach of children. If the appliance is installed in-
side or between cabinets, ensure sufficient space
for normal servicing; therefore it is advisable to
leave clearance of at least 40 cm on the right of
the boiler in order to open the lateral hatch and
a space of 3 cm between the remaining sides of
the boiler and the sides of the cabinet. Leave
adequate space above the boiler for possible
water and flue connections. Keep all flammable
objects away from the appliance (paper, rags,
plastic, polystyrene, etc.).
In the event of malfunctions, faults or incorrect
operation, turn the appliance off and contact an
authorised company (e.g. the Authorised Tech-
nical Assistance centre, which has specifically
trained staff and original spare parts). Do not
attempt to modify or repair the appliance alone.
Failure to comply with the above implies personal
responsibility and invalidates the warranty.
• Installation regulations:
- Installation in places with a fire risk is pro-
hibited (for example: garages, closed parking
stalls), gas appliances and relative flue ducts,
flue exhaust pipes and combustion air intake
pipes.
- Installation is also prohibited in places/en-
vironments that constitute common parts of
office condominiums such as stairs, cellars,
entrance halls, attics, lofts, escape routes,
etc. if they are not located inside technical
compartments under the responsibility of
each individual building and only accessible
to the user (for the features of the technical
compartments, see the technical standards in
force).
Attention
: these boilers are used to heat water
to below boiling temperature in atmospheric
pressure.
They must be connected to a central heating
system and domestic hot water circuit suited to
their performance and capacity. They must be
installed in rooms where the temperature can-
not fall below 0°C and must not be exposed to
atmospheric agents.
N.B.:
before starting the solar system, the solar
collector must be covered to protect the ab-
sorber from overheating and the operator from
scalding. The solar circuit must only be filled
when the hydraulic system has been completely
assembled and cannot be started before it has
been possible to eliminate the heat generated by
the solar collector.
Attention:
- To size the solar system, contact a qualified
heating engineer.
- In the event of installing a heat pump to
integrate the gas appliance, the installation
company must also be in possession of the
requirements of the legislation in force on en-
vironmental protection relating to fluorinated
greenhouse gasses.
Summary of Contents for 3.025499
Page 1: ...MAGIS HERCULES ERP IE Instruction and recommendation booklet 1 038684ENG ...
Page 2: ......
Page 39: ...39 3 3 2 2 INSTALLER USER MAINTENANCE TECHNICIAN ...
Page 66: ...66 ...
Page 67: ...67 ...