background image

36

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

M5 menu

(password must be entered)

1st Level

2nd Level

Options

Description

Default 

value

Value 

set by the 

technician

RELAY3

RELE3-0

Relay 3 not used

RELE3-0

RELE3-1

Check the storage tank recirculation pump 

(not used on this model)

RELE3-2

The relay signals the intervention of boiler block ( Can be coupled to an 

external signalling device, not supplied)

RELE3-3

The relay signals that the boiler is in heating or cooling request mode (the 

status of the system circulator pump is replicated)

(Can be coupled with an external circulator pump, not supplied)

RELE3-4

Controls the opening of an external gas valve in concomitance with an 

ignition request of the boiler burner

RELE3-5

Function not available on this boiler model

RELE3-6

In the event the boiler circulator pump is replaced with a traditional fixed 

speed circulator pump one must connect the new circulator pump to the 

relay board

P76

-15°C ÷ 

+14°C 

CE

With S34 = On. If the reading of the external probe is not correct it is possible 

to correct it in order to compensate any environmental factors

With S34 = Off. Setting not used

0°C

MAGIS

PAR. 1

0 ÷ 55°C

Heat pump set point value during the heating mode.

Attention: set the same value selected on the heat pump.

By setting the parameter = 0, the functions relating to the heat pump are 

disabled and the boiler can operate normally, without taking into account 

the activation delays due to combined operation with the heat pump.

45

PAR. 2

20 ÷ 100  

(tenths of °C)

Activation band.

Temperature interval to establish the intervention or non-intervention of 

the boiler as integration

50

PAR. 3

0 ÷ 20’

Activation delay.

Time interval relating to the activation, disabling and reactivation of the 

boiler integrating the heat pump.

20

Summary of Contents for 3.025615

Page 1: ...MAGIS VICTRIX ERP IE Instruction and recommendation booklet 1 038946ENG...

Page 2: ......

Page 3: ...fessionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions...

Page 4: ...2 5 Using the boiler 24 2 6 Troubleshooting 25 2 7 Parameters and information menu 27 2 8 Boiler shutdown 28 2 9 Restore central heating system pressure 28 2 10System drainage 28 2 11Anti freeze prot...

Page 5: ...damaged if the safety valve intervenes with an obstructed conveying system the safety valve must be conveyed away by a draining funnel or if there are leaks from the hydraulic connections on the contr...

Page 6: ...be followed scrupulously regarding the percentage neces sary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollu tion class o...

Page 7: ...escopic fitting 3 4 R RHT MHT M N 1 Rubber fitting for condensate drainage SC N 1 Condensate drainage corrugated pipe SC N 1 Extension for filling valve N 1 Filling valve N 1 Condensation collection t...

Page 8: ...ecial pickling or descaling products to remove any deposits that could compromise correct boiler operation A chemical treatment of the thermal system wa ter is required in compliance with the technica...

Page 9: ...r is made using wires with a minimum section of 0 50 mm2 and maximum section of 2 5 mm2 and with a maximum length of 50 metres External temperature probe electrical con nection Theboileronlyworksifiti...

Page 10: ...pipe length for each type of Terminal Kit This information allows calculations to be made to verify the possibility of setting up various flue configurations Positioning the gaskets black for green ra...

Page 11: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Page 12: ...ent in the kit positioning the relevant gaskets Engage the 90 80 bend with the male end smooth in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it run a...

Page 13: ...orizontal m in cluding the terminal with grid and excluding the concentric bend leaving the boiler This configurationcorrespondstoaresistancefactor of 100 In this case the special extensions must be r...

Page 14: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Page 15: ...th the male side smooth in the female side of the bend 5 up to the end stop ensuring that the internal and external wall sealing plates are fitted Fit the exhaust pipe 9 with the male side smooth to t...

Page 16: ...ical data The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a...

Page 17: ...th is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in ex haust two 90 80 bends on the boiler outlet 1 16 CONFIGURATION TYPE B OPEN CHAMBER AND FAN ASSISTED FOR INDOORS The appli...

Page 18: ...ns featured on the boiler active upon initial ignition and on the heat pump see relative instructions booklet Vent the boiler circulation pump by loosening the front cap and keeping the motor running...

Page 19: ...level from a minimum one to a maximum one by turning the selector switch clockwise in the relative power scale Proportional head program P V 3 fig 1 25 This allows the pressure level head to be propo...

Page 20: ...functioning characteristics of the boiler thanks to its inspectionable filter Kit with two motorised areas on request In the event one wants to divide the thermal sys tem in two areas to interlock the...

Page 21: ...on module 14 Manual air vent valve 15 Negative signal pressure point 16 Positive signal pressure point 17 Sample points air A flue gas F 18 Flue safety thermostat 19 Heat exchanger safety thermal fuse...

Page 22: ...d to weathering rain sunlight etc the appliance power cable must not be re placed by the user if the cable is damaged switch off the ap pliance and solely contact an authorised company to replace it i...

Page 23: ...fter a request for domestic hot water or central heating in order to evacuate residual flue gas F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heatin...

Page 24: ...ting stage if the water temperature is sufficient to heat the system the boiler can operate just with the activation of water circulation Winter operation mode with room central heating with boiler 2...

Page 25: ...on circuit or anomaly in the flame control unit Press the Reset button 1 2 23 Return probe anomaly The board detects an anomaly on the system return NTC probe The boiler does not start 1 2 24 Push but...

Page 26: ...g and cooling are inhibited Check the type of anomaly directly on the remote panel display see relative instruc tions manual In the event the heat pump does not fea ture any anomaly check that the dom...

Page 27: ...ntenance chapter By turning the central heating temperature se lector switch 3 scroll through the menu items By pressing button D access the various levels of the menu and the choice of parameters is...

Page 28: ...Victrix ErP series boiler features an anti freeze function that lights the burner automatically when the temperature falls below 4 C standard protection up to minimum tem perature of 3 C All informat...

Page 29: ...omestic hot water check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided If even only a single safety check offers a negative result do n...

Page 30: ...re point 22 Flue sample point 23 Fumes hood 24 Heat exchanger safety thermal fuse 25 Delivery probe 26 Safety thermostat 27 Ignition electrodes 28 Burner 29 Condensation module cover 30 Return probe 3...

Page 31: ...tle water circulation in the system or blocked pump Check on the manometer that the system pressure is within established limits Check that the radiator valves are not closed and also the functionalit...

Page 32: ...in the table Par 3 20 3 6 CALIBRATION OF NUMBER OF FAN REVS Attention verification and calibration is neces sary in the case of transformation to other types of gas in the extraordinary maintenance ph...

Page 33: ...ating selector switch to maxi mum turn it in a clockwise direction until 99 is seen on the display To have an exact value of CO2 in the flue gases the technician must insert the sampling probe to the...

Page 34: ...efines the maximum flow tempera ture corresponding to operation with minimum external temperature see graph Fig 1 5 it can be set between 50 C and 85 C N B to continue one must confirm the parameter p...

Page 35: ...to automatic functioning therefore with variable flow rate Open adjuster completely open therefore maximum flow rate available 09 L M 12 L M and 15 L M operation with defined flow AUTO RELAY1 RELE1 0...

Page 36: ...event the boiler circulator pump is replaced with a traditional fixed speed circulator pump one must connect the new circulator pump to the relay board P76 15 C 14 C CE With S34 On If the reading of...

Page 37: ...HEATING OPERATION IN COMBINATION WITH THE HEAT PUMP Following a request during the room heating mode the electronics decide according to the external temperature whether to activate the heat pump or w...

Page 38: ...han that set by the do mestic hot water selector switch SET the boiler does not switch on 3 18 YEARLY APPLIANCE CHECK AND MAINTENANCE The following checks and maintenance should be performed at least...

Page 39: ...screws 11 disassemble the front 1 of the boiler by loos ening the screw 2 by 1 4 turn push the front upwards while pulling it towards you at the same time to release it from the side 3 and upper 4 ho...

Page 40: ...17200 2 16 3 48 35 5 1 61 3 40 34 7 1 58 4 54 46 3 19 0 16340 2 05 3 17 32 3 1 53 3 10 31 6 1 50 4 15 42 4 18 0 15480 1 94 2 87 29 3 1 45 2 81 28 6 1 42 3 79 38 7 17 0 14620 1 84 2 59 26 5 1 37 2 53...

Page 41: ...ss at casing with burner On Off 80 60 C 0 49 0 70 Heat loss at flue with burner On Off 80 60 C 0 02 1 90 Central heating circuit max operating pressure bar 3 Maximum heating temperature C 90 Adjustabl...

Page 42: ...r N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn max CH maximum heat...

Page 43: ...0 071 kW At partial load elmin 0 010 kW Ignition burner energy consumption Pign 0 000 kW In standby mode PSB 0 005 kW Emissions of nitrogen oxides NOX 23 mg kWh For mixed central heating appliances St...

Page 44: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Page 45: ...e energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficiency is influenced by further fac...

Page 46: ...contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100...

Page 47: ...ncy under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 ___ 2 1 1 x ___ 10 x ___ ____ ____ Auxiliary electricity...

Page 48: ...mmergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 038946ENG rev ST 002042 001 06 19 Inglese p...

Reviews: