background image

ES

CZ

HU

SL

HR

116

IE

PL

IE

ES

117

CZ

HU

SL

HR

PL

Sensor fault - Yellow indicator lamp (2) fl ashing.

 On igni-

tion, if the control unit detects a fault on the NTC sensor, the 

boiler does not start; in this case contact a qualifi ed technician 

for assistance (e.g. Immergas Technical Services Centre).

Boiler shutdown.

 Turn off  the main switch (4) by setting 

to “0” (yellow indicator lamp 2 OFF) and close the gas sup-

ply valve upstream of the appliance. Nev er leave the boiler 

switched on if left unused for pro longed periods.

Heating system pressure.

Periodically check the system water pressure.  e boiler pres-

sure gauge should read a pressure be tween 1 and 1,2 bar.

If the pressure falls below 1 bar (with the circuit cool) restore 

normal pressure via the valve located at the bottom of the boiler 

(see fi gure).

N.W.:

 close the valve on completion. 

If pressure values reach around 3 bar the safety valve may 

be activated.

In this case contact a professional technician for as sist ance.
In the event of frequent pressure drops, contact qual i fi ed 

personnel for assistance to eliminate system leak age.

Draining the system.

To drain the system completely, use the drain valve (see fi gure 

above and on page 114).

Before draining, ensure that the fi lling valve is closed.

Anti-freeze protection.

 e boiler is equipped as standard with an anti-freeze fun-

ction ( ) that activates the pump and burner when sys tem 

water  temperature  falls  below    8°C  and  de ac ti vates  once 

temperatures reach 43°C.  e anti-freeze function is gua-

ranteed if the boiler is totally operative and not in “block” 

status, when connected to the elec tri cal power supply and 

the main switch is set ( ) mode. To avoid continued ope-

ration in the event of prolonged absence, the sys tem must 

be drained completely or anti-freeze sub stanc es should be 

added to the heating system wa ter. In appliances subject to 

fre quent draining, the system must be refi lled with suit a bly 

treated water to elim i nate hardness that may cause limescale 

formation.

Boiler ignition.

 Before switching on the boiler, check that 

the system is fi lled with water and that gauge (1) indicates 

a pressure of 1÷1,2 bar.

- Open the gas valve downstream of the boiler.
- Turn the main switch (4) to the setting Heating ( ) to 

enable standby mode, i.e. boil er on but no fl ame present 

(both indicator lamps switched off ), this status remains 

until the burner is ignited and the cir cu la tion pump is 

activated (indicator lamp 2 ON).

With the switch set to (  ) the heating regulation se lec tor 

(5) is used to regulate the temperature of ra di a tors, rotate 

clockwise to increase the temperature and  counterclockwise 

to decrease.

Boiler operation is now automatic.

Ignition block - Red indicator lamp (3) ON.

 Each time 

heating is required the boiler is activated automatically. If 

this does not oc cur within 10 seconds, the boiler activates 

an “ig ni tion block” (indicator lamp 3 ON). To eliminate the 

block, rotate the main switch (4) temporarily to the Reset 

position. On initial ignition or following a pro longed period 

of disuse the ignition block may need to be inhibited. If this 

function is activated re peat ed ly, con tact a qualifi ed technician 

for assistance (e.g. Immergas Technical Services Centre).

Temperature  overload  block  –  Red  indicator  lamp  (3) 

fl ashing.

 During normal operation, if a fault causes a in-

ternal tem per a ture overload condition, boiler operation is 

shut off .
To startup the boiler, set the main switch (4) tem po rar i ly 

to Reset. If this fault occurs repeatedly, contact a qualifi ed 

technician for assistance (e.g. Immergas Technical Services 

Centre).

Air  pressure  switch  activation  failure  -  Red  in di ca tor 

lamp (3) and yellow indicator lamp (2) fl ash ing.

  is fault 

condition occurs if the intake or ex haust pipes are blocked 

or a fan fault. In this case contact a qualifi ed technician 

for assistance (e.g. Immergas Technical Services Centre). If 

normal con di tions are restored the boiler resumes operation 

with out requiring reset.

Insuffi  cient circulation water – Red indicator lamp (3) 

ON, yellow indicator lamp (2) fl ash ing. 

 is occurs when 

the boiler is overheating because of insuffi  cient circulation of 

water in the primary circuit; causes may be the following:
- low circulation system; check that no shutoff  devices are 

closed on the heating circuit or that any air bub bles are 

present in the system;

- circulator blocked; release (see page 113).
- the water pressure in the heating circuit is not enough to 

guarantee the correct functioning of the boiler. Check that 

pres sure is between 1 and 1,2 bar;

If normal con di tions are restored the boiler resumes operation 

with out requiring reset.

If this function is activated re peat ed ly, con tact a qualifi ed 

technician for assistance (e.g. Immergas Technical Services 

Centre).

Bottom view

Gas cock

Filler cock

Drain cock

Domestic water inlet cock

Summary of Contents for EOLO Mini S

Page 1: ...encias Podręcznik obsługi wraz z instrukcjami Návod k použití a upozornění Uputstva i napomene Priročnik z navodili in o pozorili Használati utasítás és figyelmeztetések Instruction booklet and warning ES CZ PL HR SL HU IE EOLO Mini S ...

Page 2: ... przyszłość ponieważ zawiera ważne wskazówki dotyczące bezpieczeństwa instalacji eksploatacji i konserwacji Instalacja i konserwacja powinny być wykonane zgodnie z obowiązującymi normami według instrukcji producenta i przez wykwalifikowany personel tj osoby posiadające konkretną wiedzę techniczną z zakresu instalacji Niewłaściwa instalacja może spowodować obrażenia u ludzi i zwierząt a także szkod...

Page 3: ...inõsül Az érvényes mûszaki jellegû jogszabályok szabványok és a jelen kézikönyvben leírt vagy egyéb módon a gyártó által átadott utasítások be nem tartásából származó beüzemelési mûködési és karbantartási hibák esetén a gyártónak semmilyen szerzõdéses vagy szerzõdésen kívüli felelõssége nincs az esetleges károkért és a berendezésre vonatkozó garancia megszûnik IE adekvatno osposobljenog i opremlje...

Page 4: ... cm between the boiler casing and the sides of the cabinet is recommended Keep all flammable objects well away from the appliance paper cloths plastic polystyrene etc In the event of malfunctions faults or incorrect operation switch the appliance off immediately and contact a qualified technician e g from the Immergas Service centre to ensure use of original spare parts Never attempt to modify or ...

Page 5: ...t safety standards Caution Immergas S p A declines all liability for damage or physical injury caused by failure to connect the boiler to an efficient earthing system or failure to observe reference standards Also ensure that the electrical installation corresponds to maximum absorbed power specifications as shown on the boiler dataplate Boilers are supplied complete with an X type power ca ble wi...

Page 6: ...sed on the temperature of fluids conveyed through the ducts and therefore varies according to applications for air intake or flue exhaust Each component has a resistance corre sponding to a specific length in metres of pipe with the same diameter the so called equivalent length All boilers have a maximum resistance factor based on testing at 100 e maximum admissible resistance factor corresponds t...

Page 7: ...t 16 5 m 1 Intake m 7 1m Intake and exhaust 46 m 2 8 Intake m 20m Intake and exhaust 6 m 0 4 Intake 2 6m Intake and exhaust 7 5 m 0 5 Intake 3 3m Exhaust 5 5 m Exhaust 7 0m Exhaust m 5 5m Intake m 14m Exhaust 2 0m Exhaust 2 5m m 2 8 m 3 5 m 2 8 Exhaust m 15m m 7 6 Exhaust 10 6m m 5 3 m 1 9 Intake and exhaust 32 Terminal complete with concentric horizontal Terminal complete with concentric horizont...

Page 8: ...intake terminal Ø 80 m 1 with or without insulation 0 4 m 0 5 m Intake 2 3 Exhaust 3 0 8 m Intake 5 0 5 m Intake 3 0 2 m 0 3 m 0 2 m 0 1 m 2 2 m Sdoppiato parallelo Ø 80 da Ø 60 100 a Ø 80 80 Intake 3 8 m Exhaust 2 9 m 0 5 m Intake and exhaust 8 8 1 5 m 2 3 m Intake 16 9 m Exhaust 13 m Intake and exhaust 39 Terminal complete with concentric horizontal intake exhaust Ø 80 125 6 5 m Intake 14 8 m Ex...

Page 9: ...ore the intake and exhaust duct Selection of a suitable diaphragm depends on the type of ducting used and maximum length calculations can be made using the values in the tables below N W Diaphragms are supplied as standard with the boi ler e values for maximum length are considered with 1 metre of exhaust pipe and the remaining on intake DIAPHRAGM Duct length in metres Ø 60 100 vertical Ø 41 5 Fro...

Page 10: ...xhaust kit Ø 80 125 Kit assembly install the bend with flange 2 on the central hole of the boiler taking care to insert the seal 1 and tighten with the screws supplied in the kit Fit the adapter 3 with the male section smooth in the female section of the bend 2 with lip seal to the end stop Fit the concentric terminal Ø 80 125 4 with the male section smooth in the female section of the adapter 3 w...

Page 11: ...tings and concentric elbows Ø 80 125 To install snap fit extensions with other elements of the boiler assembly proceed as follows fit the concentric pipe or elbow with the male section smooth on the female section with lip seal to the end stop on the previously installed to ensure sealing efficiency of the couplings Caution if the exhaust terminal and or extension concen tric pipe needs shortening...

Page 12: ... the pipe or elbow with the male section smooth on the female section with lip seal to the end stop on the previously installed to ensure sealing efficiency of the couplings Installation clearances e following figure shows the mi nimum installation clearances for the terminal separator kit Ø 80 80 in maximum admissible conditions Extensions for separator kit Ø 80 80 e maximum straight length witho...

Page 13: ...nd cap 6 on terminal 7 Join the exhaust pipe 9 with the male section smooth in the female section of the bend 10 to the end stop ensuring that the washer 8 is already inserted for correct installation between the pipe and flue Snap fit extension pipe fittings and elbows To install snap fit extensions with other elements of the boiler assembly proceed as follows fit the concentric pipe or elbow wit...

Page 14: ...ndensation in insulated exhaust Ø 80 pipes due to cooling via the wall the exhaust pipe length must be restricted to 12 metres e figure above illustrates a typical insulation application in which the intake pipe is short and the exhaust pipe very long over 5 m e entire intake pipe is insulated to prevent condensation of humid air in the boiler environment in contact with the cooled pipe conveying ...

Page 15: ...d in current technical standards Fumes exhaust on natural draught appliances in open top closed environments In spaces closed on all sides with open tops ventilation pits light wells inner court yards etc direct discharge of fumes is allowed for natural or forced draught gas appliances with a heat output from 4 to 35 kW provided the specifications of current technical standardsare System filling O...

Page 16: ...est e boiler is de signed for installation of system shutoff valves for insertion on delivery and return pipelines on the connection assem bly This kit is particularly useful as it enables draining of the boiler separately from the entire system N W in presence of By Pass kit the cocks must be instal led in the system and not in the boiler By pass kit on request If zone valves are installed on the...

Page 17: ...al pressure socket 6 Fan safety pressure switch 7 Sealed chamber 8 NTC limit and regulation sensor 9 Termp overload safety thermostat 10 Expansion vessel 11 Combustion chamber 12 Automatic air vent valve 13 Circulating pump 14 3 bar safety valve 15 System drain valve 16 System filling valve 17 Flue extractor hood 18 Primary heat exchanger 19 Ignition detection electrodes 20 Burner ...

Page 18: ...y of ducting or devices for flue extraction and relative accessories switch off the appliance and on comple tion of operations ensure that a qualified technician checks efficiency of the ducting or other devices Never clean the appliance or connected parts with easily flammable substances Never leave containers or flammable substances in the same environment as the appliance Caution use of compone...

Page 19: ...lamps switched off this status remains until the burner is ignited and the circulation pump is activated indicator lamp 2 ON With the switch set to the heating regulation selector 5 is used to regulate the temperature of radiators rotate clockwise to increase the temperature and counterclockwise to decrease Boiler operation is now automatic Ignition block Red indicator lamp 3 ON Each time heating ...

Page 20: ...rgent to clean the boiler casing Never use abrasive or powder detergents Decommissioning In the event of permanent shutdown of the boiler contact professional personnel for the procedures and ensure that the electrical water and gas supply lines are shut off and disconnected ...

Page 21: ...ilation and or aeration of the boiler environment If any checks inspection give negative results do not start the boiler Room thermostat and clock programmer the boiler is designed for application of an room thermostat TA and of a clock programmer CP If you have only one of these devices connect to terminals 6 and 9 and remove jumper P1 Whereas if you have both connect TA on terminals 8 and 9 and ...

Page 22: ... opening of the hood on the air venting valve see fig page 114 Ensure that system pressure and pre charge of the expansion vessel are within the set limits the per charge value for the expansion vessel must be 1 bar and system pressure between 1 and 1 2 bar Ignition block see pages 116 and 102 electrical connec tion Converting the boiler to other types of gas In the event of converting the boiler ...

Page 23: ... modulating coil simply detach a faston turn the screw clockwise to increase pres sure and counterclockwise to decrease On completion of adjustment turn power on to the modulating coil Boiler minimum heat output pressure must be not be adjusted to less than the values given in the tables on page 122 according to the type of gas Heating power adjustment see figure page 121 Adjust the room heating p...

Page 24: ...the rear boiler panel as shown in the figure Pull the casing forwards and up at the same time see figure to detach from the upper hooks 845 gas valve for Eolo Mini S Eolo Mini S electronic card Key 1 Coil 2 Minimum power adjustment screw 3 Maximum power adjustment screw 4 Gas valve outlet pressure point 5 Gas valve inlet pressure point 6 Protection hood 10 2A fuse 11 Slow lighting adjustment trimm...

Page 25: ... than ten seconds Visually inspect to check for leakage of water or oxidation of relative couplings Check visually that the water safety drain valve is not blocked Check that the charge of the expansion vessel after dischar ging system pressure to the zero setting check via boiler pressure gauge is at 1 bar Check that the system static pressure in cold conditions and after system recharging via th...

Page 26: ...mm w g 1 3 20 204 0 77 29 296 0 77 37 377 Heating circuit max operating pressure Heating circuit max operating temperature Heating temperature range Total expansion tank volume Expansion tank pre load Generator water capacity Head available with 1000 l h flow rate Full boiler Empty boiler weight bar C C l bar l kPa m w g kg kg 3 90 38 85 6 1 0 3 5 24 5 2 5 37 33 Electrical connection Rated absorpt...

Page 27: ...www immergas com is instruction booklet is made of ecolo gical paper Cod 1 019370 Rev 15 014939 000 06 03 ...

Reviews: