144
TR
SI
CZ
HU
RO
PL
RU
UA
SK
ES
IE
1
BOILER
INSTALLATION
1.1 INSTALLATION
RECOMMENDATIONS.
The Nike Mini Nike 24 3 E boiler has been de-
signed for wall mounted installation only; they
must be used to heat environments, to produce
domestic hot water and similar purposes.
The wall surface must be smooth, without any
protrusions or recesses enabling access to the
rear part. They are NOT designed to be installed
on plinths or floors (Fig. 1-1).
Only professionally qualified heating/plumbing
technicians are authorised to install Immergas
gas appliances. Installation must be carried out
according to the standards, current legislation
and in compliance with local technical regula-
tions and the required technical procedures.
Installation of the Mini Nike 24 3 E boiler when
powered by LPG must comply with the rules
regarding gases with a greater density than air
(remember, as an example, that it is prohibited
to install systems powered with the above-men-
tioned gas in rooms where the floor is at a lower
quota that the average external country one).
Before installing the appliance, ensure that it
is delivered in perfect condition; if in doubt,
contact the supplier immediately. Packing ma-
terials (staples, nails, plastic bags, polystyrene
foam, etc.) constitute a hazard and must be kept
out of the reach of children. If the appliance
is installed inside or between cabinets, ensure
sufficient space for normal servicing; therefore
it is advisable to leave clearance of at least 3 cm
between the boiler casing and the vertical sides
of the cabinet. Leave adequate space above the
boiler for possible water and flue removal con-
nections. It is just as important that the intake
grids are not obstructed. Keep all flammable
objects away from the appliance (paper, rags,
plastic, polystyrene, etc.). Do not place household
appliances underneath the boiler as they could
be damaged if the safety valve intervenes (if
not conveyed away by a discharge funnel), or if
there are leaks from the hydraulic connections;
on the contrary, the manufacturer cannot be
held responsible for any damage caused to the
household appliances.
In the event of malfunctions, faults or incorrect
operation, turn the appliance off immediately
and contact a qualified technician (e.g. the Im-
mergas After-Sales Assistance centre, which
has specifically trained staff and original spare
parts). Do not attempt to modify or repair the
appliance alone. Failure to comply with the above
implies personal responsibility and invalidates
the warranty.
• Installation regulations:
- these boilers cannot be installed in bedrooms
or shower or bathrooms; They cannot be in-
stalled in rooms with open fires without their
own air flow. They must be installed in rooms
where the temperature cannot fall below 0°C
and must not be exposed to atmospheric
agents.
- Type B open chamber boilers must not be
installed in places where commercial, artisan
or industrial activities take place, which use
products that may develop volatile vapours
or substances (e.g. acid vapours, glues, paints,
solvents, combustibles, etc.), as well as dusts
(e.g. dust deriving from the working of wood,
coal fines, cement, etc.), which may be dam-
aging for the components of the appliance
and jeopardise functioning.
Important:
Wall mounting of the boiler must
guarantee stable and efficient support for the
generator.
The plugs (standard supply) are to be used only in
conjunction with the mounting brackets or fixing
template to fix the appliance to the wall;
they only
ensure adequate support if inserted correctly (ac-
cording to technical standards) in walls made of
solid or semi-hollow brick or block. In the case of
walls made from hollow brick or block, partitions
with limited static properties, or in any case walls
other than those indicated, a static test must be
carried out to ensure adequate support.
N.B.: the hex head screws supplied in the blister
pack are to be used exclusively to fix the relative
mounting bracket to the wall.
These boilers are used to heat water to below boil-
ing temperature in atmospheric pressure.
They must be connected to a central heating
system and hot water circuit suited to their
performance and capacity.
1.2 MAIN DIMENSIONS.
Fig. 1-2
Fig. 1-1
Key:
G - Gas supply
AC - Domestic hot water outlet
ACV - Solar valve kit DHW inlet
(Optional)
AF - Domestic cold water inlet
R - System return
M - System flow
V - Electrical connection
N.B.: connection group (optional)
Height
(mm)
Width
(mm)
Depth
(mm)
785
440
240
CONNECTIONS
GAS
DOMESTIC
HOT WATER
SYSTEM
G
AC
AF
R
M
3/4”
1/2”
1/2”
3/4”
3/4”
YES
NO
Summary of Contents for MINI NIKE 24 3 E
Page 2: ......
Page 21: ...19 PL ES TR SI CZ HU RO IE RU UA SK Fig 3 5 4 4 5 6 6 d d c ...
Page 39: ...37 TR SI CZ HU RO IE RU UA SK ES PL Rys 3 5 4 4 5 6 6 d d c ...
Page 56: ...54 PL SI CZ HU RO IE RU UA SK ES TR Şek 3 5 4 4 5 6 6 d d c ...
Page 73: ...71 TR SI PL HU RO IE RU UA SK ES CZ Obr 3 5 4 4 5 6 6 d d c ...
Page 90: ...88 TR PL CZ HU RO IE RU UA SK ES SI Sl 3 5 4 4 5 6 6 d d c ...
Page 107: ...105 TR SI CZ PL RO IE RU UA SK ES HU 3 5 ábr 4 4 5 6 6 d d c ...
Page 124: ...122 TR SI CZ HU RO IE PL UA SK ES RU Илл 3 5 4 4 5 6 6 d d c ...
Page 141: ...139 TR SI CZ HU PL IE RU UA SK ES RO Fig 3 5 4 4 5 6 6 d d c ...
Page 160: ...158 TR SI CZ HU RO PL RU UA SK ES IE Fig 3 5 4 4 5 6 6 d d c ...
Page 177: ...175 TR SI CZ HU RO IE RU UA PL ES SK Obr 3 5 4 4 5 6 6 d d c ...
Page 194: ...192 TR SI CZ HU RO IE RU PL SK ES UA Мал 3 5 4 4 5 6 6 d d c ...
Page 197: ......