147
TR
SI
CZ
HU
RO
PL
RU
UA
SK
ES
IE
Fig. 1-9
Total head available to the system.
To
ta
l h
ea
d (m H
2
O)
Flow rate (l/h)
H
ea
d (kP
a)
A = Head available to the system at
maximum speed with by-pass
excluded.
B = Head available to the system at
maximum speed with by-pass
inserted.
C = Head available to the system
at second speed with by-pass
excluded.
D = Head available to the system
at second speed with by-pass
inserted.
A
B
C
D
1.10 GAS SYSTEM START-UP.
To start up the system proceed as follows:
- open windows and doors;
- avoid presence of sparks or naked flames;
- bleed all air from pipelines;
- check that the internal system is properly sealed
according to specifications.
1.11 BOILER START UP (IGNITION).
For issue of the envisioned Declaration of Con-
formity, the following must be performed for
boiler start-up:
- check that the internal system is properly sealed
according to specifications
- make sure that the type of gas used corresponds
to boiler settings;
- switch the boiler on and check correct igni-
tion;
- make sure that the gas flow rate and relevant
pressure values comply with those given in the
manual (par. 3.18);
- check the correct ventilation of the rooms;
- check the existing draught during normal
functioning of the appliance, e.g. a draught
gauge positioned at the exit of the appliance
combustion products;
- check that there is no backflow of combustion
products into the room, even during function-
ing of fans;
- ensure that the safety device is engaged in the
event of gas supply failure and check activation
time;
- check activation of the main switch located
upstream from the boiler.
The boiler must not be started up even if only
one of the checks should be negative.
N.B.:
the boiler preliminary check must be carried
out by a qualified technician. The conventional
boiler warranty is valid as of the date of testing.
The test certificate and warranty is issued to the
user.
1.12 CIRCULATION PUMP.
The Mini Nike 24 3 E series boilers are supplied
with a built-in circulation pump with 3-posi-
tion electric speed control. The boiler does not
operate correctly with the circulation pump on
first speed. To ensure optimal boiler operation,
in the case of new systems (single pipe and
module) it is recommended to use the pump
at maximum speed. The pump is already fitted
with a condenser.
Pump release.
If, after a prolonged period of
inactivity, the circulation pump is blocked,
unscrew the front cap and turn the motor shaft
using a screwdriver. Take great care during this
operation to avoid damage to the motor.
By-pass regulation (part. 20 Fig. 1-10).
If neces-
sary, the by-pass can be regulated according to
system requirements from a minimum (by-pass
excluded) to a maximum (by-pass inserted)
represented by the graphics (Fig. 1-9).
Make the regulation using a flat head screw-
driver, turn clockwise and insert the by-pass,
anti-clockwise it is excluded.
1.13 KITS AVAILABLE ON REQUEST.
• System shut off valves kit. The boiler is designed
for installation of system interception cocks
to be placed on flow and return pipes of the
connection assembly. This kit is particularly
useful for maintenance as it allows the boiler to
be drained separately without having to empty
the entire system.
• Polyphosphate dispenser kit. The polyphos-
phate dispenser reduces the formation of lime-
scale and preserves the original heat exchange
and domestic hot water production conditions.
The boiler is prepared for application of the
polyphosphate dispenser kit.
The above-mentioned kits are supplied complete
with instructions for assembly and use.
Summary of Contents for MINI NIKE 24 3 E
Page 2: ......
Page 21: ...19 PL ES TR SI CZ HU RO IE RU UA SK Fig 3 5 4 4 5 6 6 d d c ...
Page 39: ...37 TR SI CZ HU RO IE RU UA SK ES PL Rys 3 5 4 4 5 6 6 d d c ...
Page 56: ...54 PL SI CZ HU RO IE RU UA SK ES TR Şek 3 5 4 4 5 6 6 d d c ...
Page 73: ...71 TR SI PL HU RO IE RU UA SK ES CZ Obr 3 5 4 4 5 6 6 d d c ...
Page 90: ...88 TR PL CZ HU RO IE RU UA SK ES SI Sl 3 5 4 4 5 6 6 d d c ...
Page 107: ...105 TR SI CZ PL RO IE RU UA SK ES HU 3 5 ábr 4 4 5 6 6 d d c ...
Page 124: ...122 TR SI CZ HU RO IE PL UA SK ES RU Илл 3 5 4 4 5 6 6 d d c ...
Page 141: ...139 TR SI CZ HU PL IE RU UA SK ES RO Fig 3 5 4 4 5 6 6 d d c ...
Page 160: ...158 TR SI CZ HU RO PL RU UA SK ES IE Fig 3 5 4 4 5 6 6 d d c ...
Page 177: ...175 TR SI CZ HU RO IE RU UA PL ES SK Obr 3 5 4 4 5 6 6 d d c ...
Page 194: ...192 TR SI CZ HU RO IE RU PL SK ES UA Мал 3 5 4 4 5 6 6 d d c ...
Page 197: ......