157
TR
SI
CZ
HU
RO
PL
RU
UA
SK
ES
IE
Fig. 3-4
Installation drawings key:
Unmistakable component identification
Sequential identification of the operation to perform
a
1
1
3
3
2
a
b
b
c
3.16 CASING REMOVAL.
To facilitate boiler maintenance the casing can be
completely removed as follows: (Fig. 3-4 / 3-5):
1 Unhook the decorative frame (a) from the
relative lower retainers.
2 Remove the decorative frame (a) from the cas-
ing (c).
3 Loosen the 2 front screws (b) for fixing the
casing.
4 Loosen the 2 lower screws (d) for fixing the
casing.
5 Pull the case towards yourself (c).
6 Push the case (c) upwards at the same time to
release it from the upper hooks.
Summary of Contents for MINI NIKE 24 3 E
Page 2: ......
Page 21: ...19 PL ES TR SI CZ HU RO IE RU UA SK Fig 3 5 4 4 5 6 6 d d c ...
Page 39: ...37 TR SI CZ HU RO IE RU UA SK ES PL Rys 3 5 4 4 5 6 6 d d c ...
Page 56: ...54 PL SI CZ HU RO IE RU UA SK ES TR Şek 3 5 4 4 5 6 6 d d c ...
Page 73: ...71 TR SI PL HU RO IE RU UA SK ES CZ Obr 3 5 4 4 5 6 6 d d c ...
Page 90: ...88 TR PL CZ HU RO IE RU UA SK ES SI Sl 3 5 4 4 5 6 6 d d c ...
Page 107: ...105 TR SI CZ PL RO IE RU UA SK ES HU 3 5 ábr 4 4 5 6 6 d d c ...
Page 124: ...122 TR SI CZ HU RO IE PL UA SK ES RU Илл 3 5 4 4 5 6 6 d d c ...
Page 141: ...139 TR SI CZ HU PL IE RU UA SK ES RO Fig 3 5 4 4 5 6 6 d d c ...
Page 160: ...158 TR SI CZ HU RO PL RU UA SK ES IE Fig 3 5 4 4 5 6 6 d d c ...
Page 177: ...175 TR SI CZ HU RO IE RU UA PL ES SK Obr 3 5 4 4 5 6 6 d d c ...
Page 194: ...192 TR SI CZ HU RO IE RU PL SK ES UA Мал 3 5 4 4 5 6 6 d d c ...
Page 197: ......