C12
Fig. 1-11
1.10 BOILER INSTALLATION IN TYPE
“C” CONFIGURATION.
The “Victrix 115 1 I” boiler leaves the factory in
“B
23
” configuration (open chamber and fan as-
sisted), to change the configuration of the boiler
to type “C” (sealed chamber and fan assisted),
disassemble the Ø 80 adapter, the bracket and
the gasket present on the boiler cover.
Horizontal intake-exhaust kit Ø 80/125.
Kit assembly (Fig. 1-10): Install the Ø 80/125
adapter (1) on the central hole of the boiler fully
home. Slide the gasket (2) along the adapter (1)
up to the relevant groove, Fix it to the lid using
the previously disassembled sheet steel plate (3)
Engage the bend (4) with the male side (smooth)
until it is fully home on the adapter (1). Fit the
Ø 80/125 (5) concentric terminal pipe with the
male end (smooth) to the female end of the bend
(4) (with lip seal) up to the stop; making sure that
the internal (6) and external wall sealing plates
(7) have been fitted, this will ensure sealing and
joining of the elements making up the kit.
• Coupling extension pipes and concentric
elbows Ø 80/125. To snap-fit extensions with
other elements of the flue extraction elements,
operate as follows engage the concentric pipe
or elbow with the male side (smooth) on the
female section (with lip seal) up to the stop
on the previously installed element. This will
ensure sealing and joining of the elements
correctly.
The kit Ø 80/125 can be installed with the rear,
right side, left side or front outlet.
• Extensions for horizontal kit. The horizontal
intake-exhaust kit Ø 80/125 can be extended up
to a
max. horizontal distance of 7 m
(Fig. 1-11)
including the terminal with grid and excluding
the concentric bend leaving the boiler. This
configuration corresponds to a resistance factor
of 100. In these cases the special extensions
must be requested.
N.B.:
during the installation of pipes it is neces-
sary to keep a minimum inclination of 3% and
install a section clamp with pin every 3 metres.
• External grill.
N.B
.: for safety purposes, do not
even temporarily obstruct the boiler intake/
exhaust terminal.
Vertical kit with aluminium tile Ø 80/125.
Kit assembly (Fig. 1-13):
Install the Ø 80/125
adapter (1) on the central hole of the boiler fully
home. Slide the gasket (2) along the adapter (1)
up to the relevant groove, Fix it to the lid using
the previously disassembled sheet steel plate (3)
Imitation aluminium tile installation: replace
the tile with the aluminium sheet (5), shaping
it to ensure that rainwater runs off. Position
the fixed half-shell (6) on the aluminium tile
and insert the intake-exhaust pipe (7). Fit the Ø
80/125 concentric terminal pipe with the male
end (smooth) to the female end of the adapter
(1) (with lip gasket) up to the stop; making sure
that the wall sealing plate has been fitted (4), this
will ensure sealing and joining of the elements
making up the kit.
• Coupling extension pipes and concentric
elbows Ø 80/125. To snap-fit extensions with
other elements of the flue extraction elements,
operate as follows Install the concentric pipe
or elbow with the male side (smooth) on the
female section (with lip seal) to the end stop
on the previously installed element. This will
ensure sealing and joining of the elements
correctly.
Important:
if the exhaust terminal and/or exten-
sion concentric pipe needs shortening, consider
that the internal pipe must always protrude by 5
mm with respect to the external pipe.
The kit includes:
N° 1 - Adapter Ø 80/125 (1)
N° 1 - Gasket (2)
N° 1 - Wall sealing plate (4)
N° 1 - Aluminium tile (5)
N° 1 - Fixed half-shell (6)
N° 1 - Int./exhaust concentric
terminal Ø 80/125 (7)
N° 1 - Mobile half-shell (8)
C33
C33
Fig. 1-13
Fig. 1-14
Fig. 1-12
2
1
3
4
7
5
6
2
1
3
4
5
8
7
6
The kit includes:
N° 1 - Adapter Ø 80/125 (1)
N° 1 - Gasket (2)
N° 1 - Concentric bend Ø 80/125 at
87° (4)
N° 1 - Int./exhaust concentric terminal
Ø 80/125 (5)
N° 1 - Internal wall sealing plate (6)
N° 1 - External wall sealing plate (7)
C13
Fig. 1-10
MAXIM
U
M
LEN
GHT
120
TR
SI
RU
IE
CZ