14
1-17
1-14
B23
B23
B23
B23
B23
1-15
1-18
1-16
1
2
1
The kit includes:
N° 1 - Steel 80 Ø exhaust terminal (1)
The kit includes:
N° 1 - Ring (1)
N° 1 - 80 Ø exhaust
terminal (2)
1.16 INSTALLATION OF VERTICAL
TERMINALS 80 Ø.
Configuration type B, open chamber and
forced draught.
80 Ø Vertical kit (plastic for indoor applica-
tions).
Kit assembly (Fig. 1-14): install the 80 Ø terminal
(2) on the central hole on the boiler up to stop,
making sure that the wall sealing plates (1) have
been fitted. This will ensure the sealing efficiency
of the kit components.
• Maximum length (MAX L) (Fig. 1-15). The kit
with this configuration can be extended up to
a
max. measurement of 24.0 m with Victrix Pro
35 2ErP and 30.0 m with Victrix Pro 55 2ErP
,
including the terminal.
Using the Ø 80 vertical terminal for direct dis-
charge of the combustion products, the terminal
must be shortened (see quotas fig. 1-16). The wall
sealing plate (1) must also be inserted in this case
going up to stop on the boiler cover.
80 Ø Vertical kit (steel for outdoor applica-
tions).
Kit assembly (Fig. 1-17): install the 80 Ø terminal
(1) on the central hole on the boiler up to the
stop, ensuring the sealing efficiency of the kit
components.
The 80 Ø steel terminal is used to install the boiler
outdoors with a direct exhaust. The terminal
cannot be shortened and once it is installed it
will extend out by 630 mm (Fig. 1-18).
Summary of Contents for VICTRIX PRO 35 2ErP
Page 1: ...IE Instruction and warning book VICTRIX PRO 35 55 2 ErP 1 041662ENG...
Page 2: ......
Page 38: ...38 3 15 1 6 8 9 9 12 12 10 11 13 13 13 13 A A Rif A 7 7 Ref A...
Page 49: ...49...
Page 50: ...50...
Page 51: ...51...