1.3  Connections.

Gas connection (Appliance category II

2H3+

).

Our boilers are built to operate on methane gas (G20) and 

LPG. Supply pipes must be the same as or larger than the 

1/2” G boiler fitting. Before making the gas connection, 

carefully clean the inside of all the gas supply piping in order 

to remove any residue that could impair boiler efficiency. 

Also make sure the gas supply corresponds to that for which 

the boiler is arranged (see boiler dataplate). Otherwise, the 

appliance must be converted for operation with the other 

type of gas (see converting appliances for another type of 

gas). e dynamic gas supply pressure must also be checked 

(natural or LPG) according to the type used in the boiler; 

as insufficient levels can reduce generator output and cause 

malfunctions.

Ensure correct gas cock connection as shown in the assembly 

sequence shown in the figure.

e gas supply pipe must be suitably dimensioned according 

to current regulations in order to guarantee correct gas flow 

to the boiler even in conditions of max. generator output 

and to guarantee appliance efficiency (technical data). e 

coupling system must conform to standards.

Combustible  gas  quality. 

e  appliance  is  designed  to 

operate on gas free of impurities; otherwise it is advisable 

to fit special filters ahead of the appliance for restoring the 

purity of the gas.

Storage tanks (in case of supply from LPG depot).

-  New LPG storage tanks may contain residuals of inert 

gases (nitrogen) that impoverish the mixture delivered to 

the appliance, causing anomalous operation.

-  Due  to  the  composition  of  the  LPG  mixture,  layering 

of the mixture components may occur during the period 

of storage in the tanks. is can cause a variation in the 

heating power of the mixture delivered to the appliance, 

with subsequent change in its performance.

Water connection.
Important:

 before carrying out the boiler connections all the 

system pipes must be carefully cleaned with special descaling 

products for removing any deposits that could compromise 

correct boiler operation.

In order to prevent scale forming in the heating system, the 

provisions given in the regulations on water treatment in 

heating systems for civil use must be respected.
Water connections must be made in a rational way using the 

connections on the boiler template. e boiler safety valve 

outlet must be connected to a discharge funnel. Otherwise, 

the manufacturer declines any responsibility in case of flood-

ing if the drain valve cuts in.

Important: 

to preserve the life and efficiency of the domestic 

circuit exchanger, it is advisable to install the “polyphosphate 

dispenser” kit if the water has characteristics can give rise to the 

forming of scale (in particular, the kit is recommended when the 

water hardness is higher than 25 degrees French).

Condensate drain. 

To drain the condensate produced by 

the appliance, it is necessary to connect to the drainage sys-

tem by means of acid condensate resistant pipes having an 

internal diameter of at least 13 mm. e appliance drainage 

connection system must be executed in such a way as to 

prevent freezing of the liquid contained in it. Before appli-

ance start-up, ensure that the condensate can be correctly 

removed. Also, comply with national and local regulations 

on discharging waste waters.

Electrical connection.

 e entire “Victrix” boiler has IPX4D 

protection rating. Electrical safety of the appliance is only 

guaranteed  when  it  is correctly  connected  to an  efficient 

earthing system according to current safety standards.

Important:

 Immergas S.p.A. declines any responsibility for 

damage to persons or things caused by failure to connect 

the boiler to an earthing system or non-compliance with 

the reference standards
Also  ensure  that  the  electrical  system  is  suitable  for  the 

maximum power absorbed by the appliance, specified on 

the  boiler  dataplate.  Boilers  are  supplied  complete  with 

an  “X”  type  power  cable  without  plug.  e  power  cable 

must be connected to a 230V ±10% / 50Hz mains supply 

respecting the polarity L-N and earth connection 

; the 

mains power supply must also be equipped with a multi-pole 

circuit breaker with contact opening gap of at least 3 mm. 

When replacing the power supply cable, contact a qualified 

technician (e.g. Immergas Authorized Technical Assistance 

Service). e power cable must be laid as shown.

In the event of mains fuse replacement on the control card, 

use a 3.15A quick-blow fuse. Never use adapters, multiple 

sockets or extension leads for the main power supply to the 

appliance.

If correct L-N polarity is not respected during connection, 

the boiler will not detect the flame and inhibits start-up.

Important:

 also, whenever L-N polarity is not respected, if 

the neutral is live with temporary residual voltage over 30V, 

the boiler could operate just the same (but only temporarily). 

Measure the voltage with suitable instruments; do not use a 

phase tester screwdriver.

Key:

  1  -  Gas cock

  2  -  Biconical ring Ø 18

  3  -  Nut

  4  -  Gas pipe

4

INST

ALLER

USER

TECHNICIAN

5

INST

ALLER

USER

TECHNICIAN

Summary of Contents for VICTRIX ZEUS 20

Page 1: ...GB Instruction booklet and warning Installer User Technician VICTRIX 20 27...

Page 2: ...with the appliance It must be kept in a safe place and read carefully as it contains important information to ensure safe installation use and maintenance Installation and maintenance must be performe...

Page 3: ...ns 18 2 3 Control panel 19 2 4 Restoring heating system pressure 20 2 5 Draining the system 20 2 6 Anti freeze protection 20 2 7 Casing cleaning 20 2 8 Decommissioning 20 3 Boiler start up preliminary...

Page 4: ...quired procedures Before installing the appliance ensure that it is delivered in perfect condition if in doubt contact the supplier immediately Packing materials staples nails plastic bags polystyrene...

Page 5: ...manufacturer declines any responsibility in case of flood ing if the drain valve cuts in Important to preserve the life and efficiency of the domestic circuit exchanger it is advisable to install the...

Page 6: ...on In addition to the functions described in the previous point the Remote Friend Control enables the user to have under control and at hand all the important information regarding appliance and heati...

Page 7: ...set on the Remote Friend Control only if the boiler main switch is turned to Domestic Remote Friend Control Important If the Remote Friend Control is used arrange two separate lines in compliance with...

Page 8: ...tor of the single component does not depend on the type of boiler on which it is installed and is a dimen sional value It is based on the temperature of fluids passing through the ducts and therefore...

Page 9: ...ncentric horizontal intake exhaust 60 100 Intake and exhaust 9 1 4 m Intake and exhaust 5 2 0 8 m Equivalent length in metres of pipe 80 Terminal complete with concentric vertical intake exhaust 60 10...

Page 10: ...t length in metres of pipe 60 Equivalent length in metres of pipe 80 Complete vertical exhaust terminal 60 for ducting Intake 2 2 Exhaust 1 9 Intake 1 9 Exhaust 2 6 Intake 1 2 Exhaust 1 6 Exhaust 3 3...

Page 11: ...boiler inserting the seal 1 not requiring lubrica tion positioning it with the round protrusions downwards in contact with the boiler flange and tighten using the screws supplied with the kit Fit the...

Page 12: ...levant internal and external rings are fitted Fit the male end smooth of the exhaust pipe 9 up to the stop on the female end of the bend 5 making sure that the internal ring is fitted this will ensure...

Page 13: ...system Green Range 60 mm rigid and 80 flexible ducting systems can only be used for domestic use and with Immergas condensing boilers In any case ducting operations must respect the provisions contai...

Page 14: ...s be suitably designed to prevent the possible freezing of condensate inside the fume system and condensate dis charge system trap passivator tank comply with the current relevant national and local r...

Page 15: ...ollowing must be done for boiler start up check gas supply circuit tightness with the 0n Off valve closed and subsequently open with gas valve closed no gas flow must be read on the meter for 10 minut...

Page 16: ...pen adjustment screw fully unscrewed Head kPa A Flowrate l h B C Head m H 2 O Polyphosphate dispenser kit by request e polyphos phate dispenser prevents the formation of scale and preserves the origin...

Page 17: ...with seat for Venturi 13 Electronic control unit 14 Overtemperature safety thermostat 15 Circulating pump 16 Plate type heat exchanger 17 Pump safety pressure switch 18 3 bar safety valve 19 3 way val...

Page 18: ...Electronic control unit 14 Overtemperature safety thermostat 15 Circulating pump 16 Plate type heat exchanger 17 Pump safety pressure switch 18 3 bar safety valve 19 3 way valve monobloc 20 Adjustabl...

Page 19: ...ctrical water and gas supplies In case of work or maintenance to structures located in the vicinity of ducting or fume extraction devices and relevant accessories switch off the appliance and after co...

Page 20: ...iler on Stand by an illuminated horizon tal segment appears on the display In case of malfunction or anomaly the temperature is replaced by the relative error code flashing 1 Ignition block 2 Block du...

Page 21: ...an antifreeze function that starts the pump and the burner when the system water temperature inside the boiler falls below 4 C e anti freeze function is guaranteed if the boiler is fully operative and...

Page 22: ...Control or Room ermostat e boiler is arranged for application of a Room thermostat or the Remote Friend Control C A R Connect the Room ermostat to terminals 40 and 41 and remove jumper X20 e Remote Fr...

Page 23: ...el PTC S1 Main rotary switch S2 Pump flow switch microswitch S3 Domestic circuit priority microswitch T1 Voltage transformer TA Room thermostat On Off optional U1 Rectifier inside gas valve connector...

Page 24: ...stat 18 Automatic air valve 19 Igniters 20 Expansion tank 21 Air intake pipe 22 Circulating pump 23 Circulating pump pressure switch microswitch 24 One way valve 25 Circulating pump pressure switch 26...

Page 25: ...hood 19 Air analyzer chamber 20 p gas pressure point 21 Fume analyzer chamber 22 NTC limit and heating control sensor 23 Overtemperature safety thermostat 24 Automatic air valve 25 Igniters 26 Expansi...

Page 26: ...f CO2 in the fumes with boiler at min output with respect to the following table seal the gas flow regulation devices if the settings are modified after completing conversion apply the sticker include...

Page 27: ...11 Combustion parameters check For max and min heat output adjustment insert the differential manometer between P1 and P2 see fig on page 23 24 for measuring the gas pressure Bring the boiler to chimn...

Page 28: ...the system return water is below 4 C the boiler starts up and functions until reaching 42 C 3 17 System delivery temperature too high By operating the jumper 5 page 28 two delivery temperature ranges...

Page 29: ...mode jumper 5 Heating temperature preselection range 6 RS 232 computer interface VK 4115 V gas valve for Victrix 20 Electronic card 7 Output for fan rpm measurement 8 Max heating power adjustment trim...

Page 30: ...DUNGS gas valve for Victrix 27 Key 1 Gas valve inlet pressure point 2 Gas valve outlet pressure point 3 Off Set adjustment screw 12 Outlet gas flow regulator 29 INSTALLER USER TECHNICIAN...

Page 31: ...he screws 1 on the bottom of the casing front pull the bottom of the casing front outwards while at the same time pushing upwards see fig undo the screws 2 on the top of the casing front support sheet...

Page 32: ...k activation of the device against no gas ionization flame control ensure intervention time is less than ten seconds Visually check for water leaks or oxidation from on con nections and traces of cond...

Page 33: ...14 1 78 18 1 1 12 2 60 26 5 12 0 10320 1 32 1 69 17 3 0 98 1 30 13 3 0 97 1 90 19 4 10 0 8600 1 11 1 23 12 6 0 82 0 91 9 3 0 81 1 40 14 3 8 0 6880 0 89 0 84 8 6 0 67 0 60 6 1 0 66 0 90 9 2 6 0 5160 0...

Page 34: ...low limiter rated delivery min pressure Domestic circuit min pressure dynamic Domestic circuit max working pressure D specific delivery according to EN 625 Drawing capacity in continuous operation T 3...

Page 35: ...x working temperature heating circuit Adjustable heating temperature Pos 1 Adjustable heating temperature Pos 2 Total volume heating expansion tank Heating expansion tank precharge Generator water cap...

Page 36: ...www immergas com ISO 9001 Certified Company is instruction booklet is made of ecological paper Cod 1 021298 Rev 15 017635 000 04 04...

Reviews: