background image

28

CH ON

6    

7    

8    

9    

2    

3    

4    

5    

10    

11    

1    

3-2

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

3.2  WIRING DIAGRAM.

Remote controls: the boiler is designed for use 

with the Comando Amico Remoto remote 

control 

V2 

(CAR

V2

) or alternatively the Super 

Comando Amico Remoto remote control, which 

must be connected to clamps 42 and 43 of con-

nector X15 on the P.C.B., observing polarity and 

eliminating jumper X40.
Room thermostat: the boiler is designed for the 

application of the Room Thermostat (S20). Con-

nect it to clamps 40 – 41 eliminating jumper X40.
The connector X5 is used for the connection to 

the relay board.
The connector X6 is for connection to a personal 

computer.
The connector X8 is used for software updating 

operations.

3.3 TROUBLESHOOTING.

N.B.:

 maintenance operations must be carried 

out by an authorised company (e.g. Authorised 

After-Sales Technical Assistance Service).
-  Smell of gas. Caused by leakage from gas circuit 

pipelines. Check sealing efficiency of gas intake 

circuit.

- Repeated ignition blocks. No gas, check the 

presence of pressure in the network and that 

the gas adduction cock is open. Incorrect 

adjustment of the gas cock, check the correct 

calibration of the gas valve.

- Irregular combustion or noisiness. It may be 

caused by: a dirty burner, incorrect combustion 

parameters, intake-exhaust terminal not cor-

rectly installed. Clean the above components 

and ensure correct installation of the terminal, 

check correct setting of the gas valve (Off-Set 

setting) and correct percentage of CO

2

 in flue 

gas.

- Frequent interventions of the overheating 

safety thermostat. It can depend on the lack 

of water in the boiler, little water circulation 

in the system or blocked pump. Check on the 

manometer that the system pressure is within 

established limits. Check that the radiator 

valves are not closed and also the functionality 

of the pump.

- Drain trap clogged. This may be caused by 

dirt or combustion products deposited inside. 

Check, by means of the condensate drain cap, 

that there are no residues of material blocking 

the flow of condensate.

- Heat exchanger clogged. This may be caused 

by the drain trap being blocked. Check, by 

means of the condensate drain cap, that there 

are no residues of material blocking the flow of 

condensate.

- Noise due to air in the system. Check open-

ing of the special air vent valve cap (Part. 9 

Fig. 1-29). Make sure the system pressure and 

expansion vessel pre-charge values are within 

the set limits; The factory-set pressure values of 

the expansion vessel must be 1.0 bar, the value 

of system pressure must be between 1 and 1.2 

bar.

- Noise due to air inside the condensation 

module. Use the manual air vent valve (Part. 

21 Fig. 1-29) to eliminate any air present in the 

condensation module. When the operation has 

been performed, close the manual vent valve.

- Domestic hot water probe faulty. In order to 

replace the DHW probe, the storage tank does 

not have to be emptied as the probe is not in 

direct contact with the DHW inside the storage 

tank.

3.4  CONVERTING THE BOILER TO 

OTHER TYPES OF GAS.

If the boiler has to be converted to a different 

gas type to that specified on the data nameplate, 

request the relative conversion kit for quick and 

easy conversion.

The gas conversion operation must be carried 

out by an authorised company (e.g. Authorised 

After-Sales Technical Assistance Service).

To convert to another type of gas the following 

operations are required:

- disconnect the appliance;
-  replace the nozzle located between the gas pipe 

and gas/air mixing sleeve (Part. 11 Fig. 1-29), 

taking care to disconnect the appliance during 

this operation;

 Key:

 

A4  -  Display board

 

B1  -  Flow probe

 

B2  -  Domestic hot water probe

 

B4  -  External probe (optional)

 

B5  -  Return probe

 

B10  -  Flue probe

 

E1  -  Ignition electrodes

 

E2  -  Detection electrode

 

E4  -  Safety thermostat

 

F1  -  Phase fuse

 

G2  - Igniter

 

M1  -  Boiler circulator pump

 

M20  - Fan

 

M30  -  Three-way valve

 

S5  -  System pressure switch

 

S20  -  Room thermostat (optional)

 

T1  -  Boiler PCB transformer

 

X40  -  Room thermostat jumper

 

Y1  -  Gas valve

  BK -  Black

  BL -  Blue

  BR -  Brown

  G -  Green

  GY -  Grey

 G/Y -  Green-Yellow

  OR -  Orange

  P -  Purple

  PK -  Pink

  R -  Red

  W -  White

  Y -  Yellow

 

1  - Storage tank configuration jumper

 

2  -  230 Vac 50 Hz power supply

 

3  -  SUPER CAR (Optional)

 

4  -  Zones control unit (Optional)

 

5  -  IMG BUS connection

 

6  -  N°. of fan revs.

 

7  -  S34 setting

 

8  -  Supervisor connection active

 

9  -  External probe connection active

 

10  -  Domestic hot water

 

11  -  Central heating

Summary of Contents for VICTRIX ZEUS SUPERIOR

Page 1: ...VICTRIX ZEUS SUPERIOR 26 2 32 2 ERP Instruction and recommendation booklet IE 1 037935ENG...

Page 2: ......

Page 3: ...ofessionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions...

Page 4: ...e 20 2 2 General warnings 20 2 3 Control panel 20 2 4 Description of functioning states 21 2 5 Using the boiler 22 2 6 Troubleshooting 23 2 7 Parameters and information menu 25 2 8 Boiler shutdown 26...

Page 5: ...a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer cannot be held responsible for any damage caused to the household appliances For the aforementio...

Page 6: ...uid must be followed scrupulously regarding the percentage neces sary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution...

Page 7: ...et the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used upstream o...

Page 8: ...t to On Off mode CAR V2 Super CAR or On Off chrono ther mostat electrical connection Optional The operations described below must be performed after having removed the voltage from the appli ance Any...

Page 9: ...efore varies according to applica tions for air intake or flue exhaust Each single component has a resistance corresponding to a certain length in metres of pipe of the same diameter the so called equ...

Page 10: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric intake exhaust terminal 60 100 vertical Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Page 11: ...in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it run along the bend Fix it using the sheet steel plate and tighten by means of the straps present in...

Page 12: ...with the boiler flange and tighten using the screws supplied with the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of the bend 2 up to the end stop makin...

Page 13: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Page 14: ...oth in the female side of the bend 5 up to the end stop ensuring that the internal and external wall sealing plates are fitted Fit the exhaust pipe 9 with the male side smooth to the female side of th...

Page 15: ...ical data The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a...

Page 16: ...he chimney technical slot The maximum possible length of the 80 rigid ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in ex...

Page 17: ...gas may come out the condensate drain after a few minutes operation check that this no longer occurs This means that the drain trap is filled with conden sate to the correct level preventing the passa...

Page 18: ...he system flow and return accord ing to set value K Fixed 100 65 in this mode the cir culator works at constant speed the operating range is defined between minimum 65 and maximum 83 for Victrix Zeus...

Page 19: ...e functioning possibilities Cover kit on request If installed outdoors in a partially protected place with direct air intake it is compulsory to mount the appropriate top protection cover for the corr...

Page 20: ...horised local firm 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from cooking hobs Use of the boiler by unskilled persons or children is prohibited For safety purposes ch...

Page 21: ...uest for domestic hot water or central heating in order to evacuate residual flue gas F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order...

Page 22: ...ection it decreases During domestic hot water heating DHW ON appears on the display 24 on the status indicator 6 and at the same time as the burner ignites the flame presence indicator switches on 8 w...

Page 23: ...pressure is between 1 1 2 bar and restore the correct pressure if necessary 12 Storage tank probe anomaly The board detects an anomaly on the storage tank probe The boiler cannot produce domestic hot...

Page 24: ...flame signal This occurs when the boiler is ignited correctly and the burner flame switches off unexpectedly a new ignition attempt is performed and if normal conditions are restored the boiler does...

Page 25: ...els of the menu and the choice of parameters is confirmed Press button C to go back one level M1 information menu This menu contains the various information relative to boiler functioning 1st Level Bu...

Page 26: ...i freezeliquidandinstallation of the Immergas Anti freeze Kit in the boiler In the case of prolonged inactivity second case we also recommend that disconnect the electric power supply fully drain the...

Page 27: ...production of domestic hot water check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided If even only a single safety check offers a negat...

Page 28: ...ed by the drain trap being blocked Check by means of the condensate drain cap that there are no residues of material blocking the flow of condensate Noise due to air in the system Check open ing of th...

Page 29: ...casing mounted while the gas valve calibration operations must be carried out with the casing open and disconnecting the boiler from the power supply Calibration of the minimum CO2 minimum heating pow...

Page 30: ...on the domestic hot water probe on entry to the boiler P54 2 Displays the temperature read on the domestic hot water probe on exit from the boiler P54 3 Displays the temperature read on the return pr...

Page 31: ...in the cylinder falls by 3 C with respect to the temperature set Solar function deactivated P71 1 P71 2 5 C Boiler ignition for heating the domestic hot water occurs when the water contained in the cy...

Page 32: ...rts the pump at least once every 24 hours for the duration of 30 seconds in order to reduce the risk of the pump becoming blocked due to prolonged inactivity 3 11 THREE WAY ANTI BLOCK FUNCTION Both in...

Page 33: ...that it is properly fixed to the combustion chamber lid otherwise it must be replaced Visually check that the water safety drain valve is not clogged Check that after discharging system pressure and b...

Page 34: ...wer grid 1 by taking out the 4 fastening screws 2 Open the control panel door 3 remove the 2 white screw caps 4 and take out the 2 fasten ing screws 5 tilt the panel towards you Unscrew the 2 6 fasten...

Page 35: ...0 92 9 4 0 81 1 28 13 1 9 0 7740 1 00 0 73 7 4 0 75 0 77 7 9 0 73 1 09 11 1 8 0 6880 0 89 0 59 6 0 0 67 0 64 6 5 0 66 0 90 9 2 7 0 6020 0 78 0 46 4 7 0 59 0 52 5 3 0 58 0 73 7 5 6 0 5160 0 67 0 35 3...

Page 36: ...0 7 670 11 270 7 NOX at 0 of O2 at Q Nom Min mg kWh 39 22 108 50 43 30 Flue temperature at nominal output C 78 86 79 Flue temperature at minimum output C 73 82 75 Victrix Zeus Superior 32 2 ErP Gas no...

Page 37: ...h 25 8 22188 32 0 27520 Domestic hot water adjustable temperature C 10 60 10 60 Domestic hot water circuit flow limiter at 2 bar l min 8 7 12 6 Domestic hot water circuit min pressure dynamic bar 0 3...

Page 38: ...Cod Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Page 39: ...ns 60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return tempera ture Model s Victrix Zeus S...

Page 40: ...mestic hot water function AFC 18 GJ Seasonal room heating yield s 92 Domestic hot water production yield wh 82 Parameter value Yearly energy consumption for the heating function QHE 61 2 GJ Yearly ele...

Page 41: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Page 42: ...35 C From fiche of heat pump The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficien...

Page 43: ...y electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2 3 2 The energy ef...

Page 44: ...Water heating energy efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Aux...

Page 45: ...45...

Page 46: ...46...

Page 47: ...47...

Page 48: ...mmergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 037935ENG rev ST 001312 001 09...

Reviews: