C. Upright Tube
Place the right-side upright tube (302) to the right of the main frame (101); connect the flat cable
(B06) and the power supply flat cable (B07) from the main frame to the flat cable (B08) and flat
power supply cable (B09) from the upright tube. Attach and pre-fix the upright tube (302) to the
main frame (101) with the hex. socket bolts (904); Perform the same assembly on the left. Attach
and pre-fix the left-side upright tube (301) to the main frame with the hex. socket bolts (904). Be
careful not to over tighten the bolts before the full assembly is complete.
D. Monitor Assembly
Place the monitor frame assembly (401) on top of the two upright tubes (301 & 302); connect the
flat cable (B10) from the monitor assembly to the flat cable (B08) from the upright tube on the
right, then connect the power supply flat cable (B11) from the monitor assembly to the power
supply flat cable (B09) from the upright tube.
Attach the monitor assembly (401) to the two upright tubes and pre-fix the round-headed self-tap
screws (922). Tighten all the screws well when the assembly is complete.
302
B09
B08
B06
B07
301
101
904
10
Summary of Contents for ZEN 5800 Series
Page 1: ......