STEP 3 (See Diagram 3)
A.) Attach the Leg Developer Holder (#2) to the Main Seat Support (#1). Secure it with
one M10 x 5/8” Allen Bolt (#40) and Ø ¾” Washer (#39) from the top, two M10 x 3 ½”
Carriage Bolts (#48), two Ø ¾” Washers (#39), and two M10 Aircraft Nuts (#50) from
the side.
B.) Attach the Leg Developer (#12) to the Leg Developer Holder. Secure it with one Axle
(#18), two M10 x 5/8” Allen Bolts (#40), and two Ø ¾” Washers (#39).
C.) Attach an Olympic Sleeve (#28) onto the weight post on the Leg Developer. Attach a
Spring Clip (#37) to the Sleeve.
D.) Insert the Arm Curl Stand (#6) into the top opening on the Leg Developer Holder. Use
a Lock Knob (#36) to secure the Stand at desired height.
DIAGRAM 3
26
Summary of Contents for IGS-5100
Page 5: ...SMITH MACHINE HARDWARE PACK 4 ...
Page 6: ...SMITH MACHINE HARDWARE PACK 5 ...
Page 7: ...SMITH MACHINE HARDWARE PACK 6 ...
Page 8: ...SMITH MACHINE HARDWARE PACK 7 ...
Page 10: ...DIAGRAM 1 9 ...
Page 13: ...DAIGRAM 3 12 ...
Page 15: ...CABLE LOOP DIAGRAM 14 ...
Page 19: ...DIAGRAM 7 18 ...
Page 21: ...EXPLODED DIAGRAM 20 ...
Page 23: ...MULTI PURPOSE BENCH HARDWARE PACK 22 ...
Page 24: ...MULTI PURPOSE BENCH HARDWARE PACK 23 ...
Page 31: ...30 ...