STEP 6 (See Diagram 6)
A.) Insert two Foam Tubes (#16) halfway through the holes on Leg Developer (#12).
B.) Push four Vinyl Foam Rolls (#27) onto the Tubes from both ends.
C.) Push four Foam Roll End Caps (#31) into the ends.
D.) Attach the Arm Curl Handle (#19) to the back holes on the Leg Developer. Secure it with a
Lock Pin (#20). Attach the Abdominal Strap (#24) to the front holes on the Leg Developer.
Secure it with a Lock Pin (#20).
E.) Pull up and flip the Arm Curl Pad along the track to face the back of the machine when
doing abdominal exercises using the Abdominal Strap.
F.) Remove the Arm Stand and Abdominal Strap when doing Leg Developer exercises.
29
Summary of Contents for IGS-5100
Page 5: ...SMITH MACHINE HARDWARE PACK 4 ...
Page 6: ...SMITH MACHINE HARDWARE PACK 5 ...
Page 7: ...SMITH MACHINE HARDWARE PACK 6 ...
Page 8: ...SMITH MACHINE HARDWARE PACK 7 ...
Page 10: ...DIAGRAM 1 9 ...
Page 13: ...DAIGRAM 3 12 ...
Page 15: ...CABLE LOOP DIAGRAM 14 ...
Page 19: ...DIAGRAM 7 18 ...
Page 21: ...EXPLODED DIAGRAM 20 ...
Page 23: ...MULTI PURPOSE BENCH HARDWARE PACK 22 ...
Page 24: ...MULTI PURPOSE BENCH HARDWARE PACK 23 ...
Page 31: ...30 ...