STEP 5
(SEE Diagram 5)
A.) Attach the ball end of the Cable to the Pulley (#28). Place the Pulley in the open slot on
the Lat Bar Frame (#31). Secure it with one M10 x 2 1/8” Hex Bolt (#32), two Bushings
(#29), two
∅
¾” Washers (#3), and one M10 Aircraft Nut (#4).
B.) Slide the Weight Holder (#33) onto the Lat Bar Frame from the bottom. Connect the
Cable to the Holder with a Hook (#26). Attach a Spring Clip (#34) onto the post on the
Weight Holder.
D.) Connect the Lat Bar (#25) to the Cable with a Hook (#26). When using the Lat Pull
down, remove the Arm Curl and place it on the storage post behind the Rear Upright
Beam. Then insert the Lat Bar Frame into the opening on the Front Stabilizer.
9
Summary of Contents for MARCY MCB-346
Page 5: ...HARDWARE PACK 4 ...
Page 11: ...10 ...