STEP 3 (See Diagram 3)
A.) Attach the Leg Developer (#10) to the Front Leg (#8). Secure it with one M8 x 3 1/8”
Allen Bolt (#28), two Ø 5/8” Washers (#33), and one M8 Aircraft Nut (#36).
B.) Insert two Foam Tubes (#11) halfway through the holes on the Leg Developer. Push
four Foam Rolls (#19) onto the Tubes from both sides.
C.) Place a Spring Clip (#22) onto the weight post on the Leg Developer. The maximum
weight capacity for Leg Developer is 100 lbs.
DIAGRAM
3
7
Summary of Contents for MARCY MWB-356
Page 5: ...HARDWARE IDENTIFIER 4...
Page 11: ...10...