STEP 3 (See Diagram 3)
A.) Insert the Leg Developer Holder (#9) into the top opening on the Front Stabilizer (#2).
Secure it with a Lock Knob (#33).
B.) Attach the Leg Developer (#10) to the bracket on the Leg Developer Holder (#9). Secure
it with an Axle (#18), two
∅
¾” Washers (#43), and two M10 x 5/8” Allen Bolts (#40).
Insert one Foam Roll Tube (#11) halfway through the hole on the Leg Developer Holder
(#9). Insert two Foam Roll Tubes (#11) halfway through the holes on the Leg Developer
(#10). Push six Foam Rolls (#27) onto the Tubes from both sides. Plug six Foam Roll
End Caps (#26) into the ends.
C.) Slide the Olympic Sleeve (#15) onto the weight post on the Leg Developer (#10). Attach
a Spring Clip (#32) onto the Olympic Sleeve. NOTE: When using the decline position to
do Ab exercise, place at least 30lbs of weights on the post to hold down the Leg
Developer.
DIAGRAM 3
6