32
GB
Push the axle (27) into the socket at the top
of the handlebar post (2).
Screw the left pivoting arm (6L) to the axle
(27) using a bolt (24), a washer (25) and a
wave washer (64). Only tighten the bolt
manually.
Screw the left crossbar (5L) to the left pedal
arm (22) using a bolt (38L), a wave washer
(62), a spring washer (41) and nylon nut
(42L). Only tighten the bolt manually.
Screw the left pivoting arm (6L) and the left
crossbar (5L) together using a bolt (30), a
washer (31), and a nylon nut (32).
Now tighten the bolts (24, 30) and nut (42L).
Place the caps (23, 43, 57) on the tops of the
nut and bolts.
Screw the right pivoting arm (6R) to the
axle (27) using a bolt (24), a washer (25) and
a wave washer (64). Only tighten the bolt
manually.
Screw the right crossbar (5R) to the right
pedal arm (22) using a bolt (38R), a wave
washer (62), a spring washer (41) and nylon
nut (42R). Only tighten the bolt manually.
Screw the right pivoting arm (6R) and the
right crossbar (5R) together using a bolt
(30), a washer (31) and a nylon nut (32).
Now tighten the bolts (24, 30) and nut (42R).
Place the caps (23, 43, 57) on the tops of the
nut and bolts.
Screw the left and right footplate (10L, 10R)
securely to the left and right crossbar (5L,
5R) using bolts (33), washers (34) and nylon
nuts (35).
Summary of Contents for 17406
Page 51: ...51 NO SE FI GB DE DK ET...
Page 52: ...52 NO SE FI GB DE DK ET...
Page 53: ...53 NO SE FI GB DE DK ET...