VuLink connects to the
new instrument and the
data network.
VuLink connects to
HydroVu or an FTP site.
All LEDs indicate current
device status. See the
section below for details.
Understanding the LEDs
Solid red
Solid green
Blinking green
Blinking red
Battery power is at least
75%.
Battery power is
between 25% and 50%.
Battery power is
between 50% and 75%.
Battery power is less
than 25%
Battery status
10
1-970-498-1500
www.in-situ.com
Add as many as 8 instruments to VuLink, repeating the steps below for each one. When you’re
ready to deploy, use one or more Rugged Cable Splitters to connect multiple instruments.
6
Connect an Instrument
All five LEDs illuminate when VuLink is powered on. The color of an LED indicates status.
click
click
7
Add another instrument and press the button (optional)
Align the flat edge of the
connector with the flat
edge inside the cable.
Twist the cable until it
clicks into the secure
postion.
Connect the cable to
your instrument.
Disconnect instrument.
Attach another and press
the button.
Adding Instruments