Installation 3
Man-1161IN Rev.A
Taktis Vision Installation & Operation Manual
4
Section 3
Installation
Before You Begin
Before you begin the installation, take a few minutes to review the installation information, gather the required items,
and complete the tasks listed below.
General Installation Checklist
To complete the installation:
Mounting the Surface Enclosure
1/ Open the enclosure by removing the screw located at the top-centre. The enclosure lid hinges downwards. Re-
move hinge pins by pulling inwards. Disconnect earth wire and put enclosure lid safely to one side.
Figure 3-1
Opening the Enclosure
1
Create a plan and checklist before beginning the installation process. Planning can reduce the number of problems
that can occur during installation.
2
Select an environment that is suitable for operating the Annunciator. The site for mounting should be clean and dry
and not subject to excessive shock or vibration.
1
Create a plan of the fire alarm system and checklist for installing the Annunciator.
2
Remove the Annunciator from its packaging and check its contents.
3
Remove enclosure lid and temporarily store in a safe place.
4
Fix enclosure back box to wall.
5
Make network connection and dress the wires.
6
Ensure that the enclosure is free from wire ends, knockout discs and other debris.
7
Refit the enclosure lid.
8
Configure the Annunciator.
9
Test the installation.
CAUTION!
The installation must be performed by qualified personnel familiar with electronic components. Electronic compo-
nents within are vulnerable to damage from electrostatic discharge. Ground straps must be worn by installers
before handling circuit boards to prevent damage from electrostatic discharge.
Summary of Contents for Taktis Vision
Page 20: ......