- Wassermann tool change system
Orientation
Due to different requirements and/or specifications of the respective
manufacturers, be sure to review the respective manufacturer's
documentation!
For efficiency reasons, we recommend carrying out the 5000 h maintenance interval
described in the manufacturer's documentation in the 4000 h maintenance interval.
Procedure
1. Perform 5000 h maintenance according to the manufacturer's documentation.
Maintenance Summary - 4.000 Operating hours
109
Maintenance Instructions
G300.2 G320.2 G400.2 G420 G500.2 G520
DIE147EN - 17.08.2022