Slat/shingle cover (STRAPANO - Arnold) G420
1
Slider
2
Holder (two-piece)
3
Slat/shingle cover (carrier material)
This additional cover consists of three components. During visual inspection, check
only the condition of the substrate, the slider and the holder.
Procedure
1. Check the overall condition of the substrate. Assess wear. If individual parts
such as sliders, holders or carrier material are destroyed, it is imperative that
they be replaced.
2.
Caution
Cutting injury due to sharp-edged sheet metal parts.
Always wear suitable protective gloves.
Maintenance Summary - 2.000 Operating hours
71
Maintenance Instructions
G300.2 G320.2 G400.2 G420 G500.2 G520
DIE147EN - 17.08.2022