Maintenance Summary - 4.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number DIE148EN - 17.08.2022.
- Cleaning of the machine
- Clean the cover at the work area door
- Check the pressure accumulator
- Check the lubrication system
- Check the pneumatic system
- Check tool clamping sets of the milling spindles
- Check main and counter spindles
- Wassermann tool change system
- Check hydraulic system
- Check the system for reconditioning the cooling lubricant
- Check fire extinguishing system (visual inspection)
- Replace belts and check belt tension
- Replacing hydraulic fluid
- Perform data backup
- Check control cabinet and cable assemblies (visual inspection)
- Maintenance of turret steady rest SR2 or SLU X1 (by SMW)
Maintenance Summary - 4.000 Operating hours
90
Maintenance Instructions
G300.2 G320.2 G400.2 G420 G500.2 G520
DIE147EN - 17.08.2022