Maintenance Summary - Care activities
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number LR1702.10191 - 05.06.2019.
The maintenance interval is highly dependent on the production and environmental conditions of the
machine. The determination of the appropriate interval must be made by the operator.
The maintenance interval should be between once per shift and once a week!
- Check work area door and viewing glass
- Check hydraulic system (visual inspection)
- Check pneumatic system (visual inspection)
- Check filter on air conditioner cooling fan
- Checking fill levels of the fluid tanks
- Clean and lubricate clamping device
- Check electrical lines (visual inspection)
- Visual inspection of all fluid lines and electrical cables
- Clean cooling lubricant outlet on clamping cylinder
- Clean filter screens on chip conveyor
- Check cooling lubricant (visual inspection)
- Check coolant
- Check work area light (visual inspection)
- Maintenance of HSK clamping sets (from Berg)
- Clean telescopic covers and wipers
- Clean the work area
- Cleaning the chip conveyor
- Maintenance on non-contact tool monitoring system Renishaw NC-4
- Clean labyrinth ring of spindles
- Clean spindle cover of the motorized milling spindle (labyrinth ring)
Maintenance Summary - Care activities
6
Maintenance Instructions
R200
LR1702.10181 - 05.06.2019