Maintenance Summary - 2.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number LR1702.10191 - 05.06.2019.
- Check maintenance logs of servicing activities
- Clean and check wipers and guide rails of the work area door
- Check work area door (optionally with electr. drive) and viewing glass
- Check tool clamping sets of the milling spindles (from Berg)
- Checking and potentially replacing the cooling lubricant adapter (HSK tool mountings)
- Check telescopic covers and wipers
- Check outer wipers of roller guides
- Check all electrical connections and drive belts of the drive motors
- Replace filter on air conditioner cooling fan
- Check cooling unit for cooling lubricant
- Check coolant
- Clean labyrinth rings of spindles
- Check backup data carrier
- Check control cabinet
- Check wipers of Z axes on main and counter spindles
- Check cable and hose clamps for tight seating
- Replace hydraulic fluid filters