01.05.2014 (release date and version)
_________________________________________________________________________________
FB TS AS7 01 ICG® Standard Operating Procedure | released by ICG® Service Department 11
7) End of the assembly process
Simulate a brief session, checking the bike is in good working order.
8) IC7 console commissioning
a) Turn crank 2 full revolution to engage console power up mode.
b) Press both buttons on the front of the IC7 console to access to the settings menu.
a) b)