1B
OPERATION
1.9
Maintenance Instructions
The parts must be thoroughly and perfectly cleaned of all concrete debris evryday after use.
A practical suggestion is to coat the vibrating and surfacing strips and the aliminium support of the
machine with diesel oil to prevent the concrete from sticking making cleaning easier.
-
Checks
An oil check for level should be carried out everyday before starting the machine.
The machine should undergo a complet overhaul after every 100 hours of operating time, paying
special attention to the electrical components and the accelerator cable.
The flexible shaft should be lubricated after every 50
hours of operating time. This is done by loosening the
screw Pos:1 and pulling the engine Pos. 2 back
exposing the shaft Pos. 3, pull on it and check its
state, remove old lubricant with solvent and coat the
surface with a thin film of lubricant. An excess of
lubricant can lead to overheatingg and excessive
vibrations when running. (See fig. 1.9-1)
Fig.: 1.9-1
1.10 Instructions for Ordering Spare Parts
Spare parts are on sale thrugh the official services and in the brand distributors in your locality.
When you order spares do not forget to indicate:
-
Type of machine
-
Units ordered, code and description of parts requested , and whenever possible, the series
number of the machines
-
When equipment or spare parts have to be returned to the factory its necessary to contact with
Industrias Technoflex S.A. for prior agreement, “AN ABSOLUTE NECESSITY FOR THEIR
RECEPTION”.
1B-6
INGLÉS