QTY
SIZE
COLOR
Style
QTY
Style
4
21'10"
Orange
Hip Rafter
2
Half Crown AT
6
16' 5"
Brown
Keder
4
Regular Corners
2
16'1"
Brown
Rafter
8
Regular T's
8
14'4"
Red
Spreader
1
Spreader T -AT
6
9'4"
White
Spreader
12
Weights / Stakes
12
7' 8"
Black
Legs
12
Ropes
64
Tent Pins
12
Ratchets
12
Baseplates
1
Brace Package
2
Spreader Cables
Pre-Site Inspection- Call your local utitlity companies prior to installation for any underground obstructions.
1. Layout the frame parts in the estimated location peertaining to the diagram. The spreader pipe is placed out to form
the perimeter, and the rafters are laid in the interior location.
2. Start with one of the Half Crowns. Attach the hip rafters (21' 10" orange) to the Half Crown at the second and fourth
points by sliding the pole over the fitting and lining up the holes in the pole with those in the fitting. Place a pin in the
first hole to secure the pole in place.
3. Attach the 2 Rafter poles (16' 1" brown) to points - three and the 16' 5" keder pipe to points one and five of the
Half Crown using the same technique as in step 2.
4. Attach a spreader (9’4” white) to the Half Crown, and connect it to the Spreader T. Connect another spreader (9’4”
white) to the second Half Crown from the Spreader T.
5. Attach the remaining Keder Pipe (16' 5" brown) to the Spreader T's.
6. Connect the corner fittings to the hip rafter by sliding the pole over the fitting. Line up the hole of the pole with the first
hole of the fitting and place a pin.
7. Join the regular t fittings to the poles by sliding the pole over the fitting. Line up the hole of the pole with the first
hole of the fittings and place a pin.
8. The perimeter is ready for assembly. Connect the Regular T to the corners using the spreaders (14’4” red). Slide
the poles over the fittings, line up the holes, and pin the pole and fitting together. Use the white 9' 4" spreaders in the
middle. When all of the spreaders have been secured in place, the frame will be complete.
9. Slide the keder on the tent through the keder pipe starting at the regular t going up through the Half Crown, then
come back down the other side. Then slide the middle tent top pieces through the middles. Repeat the step for the
other end tent top section.
30 x 50 All Trac Frame Tent Instructions page 1 of 2
Corner
Optional Items
All Seasons Tent Sales
30 x 50 All Track Frame Tent Set Up Instructions
Components
Pipe
Corner
Half Crown AT Regular T
Spreader T AT
Half Crown
Half Crown
Spreader T
16' 5" Keder
Pipe
16' 5" Keder
Pipe
16' 5" Keder
Pipe