2.4 Moving the Cabinet
The UPS is fixed on the pallet with 4 fixing cabinet plates. When removing it, pay attention to
the movement of the casters to avoid accidents.
The cabinet can be pushed forward or backward only. Pushing it sideward is not allowed.
When pushing the cabinet, pay attention not to overturn it as the gravity center is high.
1.
If you need to move the UPS over a long distance, please use appropriate equipment like a
forklift. Do not use the UPS casters to move over a long distance.
2.
After the UPS has been removed from the pallet to ground, we suggest that at least three
people move the UPS to the installation area. One person holds a lateral side of the UPS with
hands, another holds the other lateral side of the UPS with hands, and the other person pushes
the UPS either from the front side or from the back side to the installation area and avoid
tipping the UPS.
3.
The casters are designed to move on level ground. Do not move the UPS on an uneven surface.
This might cause damage to the casters. Toppling the UPS could also damage the unit.
4.
Ensure that the weight of UPS is within the designated bearing capacity of any handling
equipment.
5.
At the bottom of the UPS, the four casters help you to move the UPS to a designated area.
Before you move the UPS, please turn the four leveling feet counterclockwise to raise them off
the ground. This protects the leveling feet from damage when moving the UPS. Refer to Figure
2-6.
Figure 2-6