USER MANUAL
Series HC
Reference No. 145 Final Rev 5
Page 11
September 2004
SECTION 1:
(Continued)
2.
Stripping
. At the end of heating, the inlet valves shift position, directing
the hot inlet air directly into the aftercooler, separator, and drying tower.
We now begin stripping. The stripping phase of regeneration lasts 90
minutes. At the beginning of stripping, the regenerating tower is
depressurized through a muffler. During stripping, a small adjustable flow
of dry air is used to remove the last little bit of moisture from the
regenerating tower.