18-GF74D1-1K-EN
25
Coil Conversion Instructions
Table 19.
Downflow
Follow the conversion steps when installing the air handler in
downflow configuration.
1.
Remove the front panels from the air handler. The coil and line set
panel do not need to be separated.
2.
Remove the fasteners on both sides of the coil.
Note:
The TEM6A0C48 and TEM6A0C60 will have a coil retaining
bracket and a shipping bracket. All other coils will have
two coil retaining brackets.
3.
Remove the two screws holding the center horizontal bracket and
rotate out of place. Retain parts.
Figure 4.
TEM8A0C48 and TEM8A0C60 Only
Figure 5.
All other models
4.
For the TEM6A0C48 and TEM6A0C60, remove the drain pan
support bracket at the top of the drain pan and discard.
Note:
The drain pan support bracket should be removed to avoid
tearing the cabinet insulation.