Loading and Enroute Inspections
54
Figure 25: Loading Considerations
1.
Unit Inspection
2.
Good Outside Air Circulation
3.
Gaskets Equally Compressed
4.
Clear Defrost Drains
5.
Tight Doors
6.
Good Air Circulation Around
Load
7.
Interior and Exterior Walls and
Insulation in Good Condition
8.
Cargo at Proper Temperature
Prior to Loading
1
6
AMA1411
2
3
4
5
8
7
Loading and Enroute Inspections
54
Figure 25: Loading Considerations
1.
Unit Inspection
2.
Good Outside Air Circulation
3.
Gaskets Equally Compressed
4.
Clear Defrost Drains
5.
Tight Doors
6.
Good Air Circulation Around
Load
7.
Interior and Exterior Walls and
Insulation in Good Condition
8.
Cargo at Proper Temperature
Prior to Loading
1
6
AMA1411
2
3
4
5
8
7
Summary of Contents for Thermo King V-520 10
Page 2: ......
Page 4: ...2 2...
Page 6: ...Introduction 4 Introduction 4...
Page 14: ...Safety Precautions 14 Safety Precautions 14...
Page 40: ...Unit Operation 40 Unit Operation 40...
Page 48: ...Specifications 48 Specifications 48...
Page 52: ...Maintenance Inspection Schedule 52 Maintenance Inspection Schedule 52...
Page 58: ...Loading and Enroute Inspections 58 Loading and Enroute Inspections 58...
Page 60: ...Serial Number Locations 60 Serial Number Locations 60...
Page 62: ...Warranty 62 Warranty 62...
Page 72: ...72 72...
Page 73: ......