1.

 Place the humidifier on a flat surface. 

Unlatch humidifier cover assembly from base 

assembly at the bottom of the cover, lift and 

set aside. Pull out the evaporative assembly 

by grasping at the top and tipping out.  

(See Figure 1)

2.

 Using a level, position this template at 

least 1

1

2

 inches above the furnace housing 

or cooling coil if applicable, for clearance 

of the drain line. Trace around template 

edges. When there is insufficient space on 

the supply plenum, the humidifier can be 

installed on the return duct provided the 

humidifier is supplied with hot water. Remove 

the template and accurately cut the plenum 

opening 14

3

4

”W x 14

5

16

“H, 

being careful to 

avoid injury from sharp edges.

3.

 Position the two plastic hooks on the top 

of base along the top edge of the plenum 

opening. Push base up to engage the two 

hooks and sheet metal along the top edge 

opening. Push base in and slide down so 

that the bottom four hooks engage the sheet 

metal at the bottom edge of the opening. 

Secure base to opening using top three 

screw holes in housing. An additional hole is 

provided at the bottom for securing the base 

to the plenum. 

(See Figure 2)

4.

 While pressing the base against the plenum, 

reach through the center opening and turn left 

and right swing latches down to secure the 

base onto the plenum. 

(See Figure 3) 

5.

 Reinstall the evaporative assembly into 

the base, with the bottom of the scale control 

insert (5) sitting firmly in the inside of the 

drain spud attached to the base. Push the 

evaporative assembly in at the top between 

the retaining ribs that hold the assembly in 

place in a vertical position. Reinstall cover 

assembly by hooking at the top of base 

assembly and latching at the bottom.

6.

 Install the Automatic Humidifier Control 

in the return duct using the installation 

instructions enclosed (see Wiring Diagram, 

opposite side). For detailed installation and 

wiring instructions, see “Installer’s Guide/ 

Automatic Humidifier Control, Form 

#18-CH31D1-3” included with the humidifier.

7.

 The humidifier power cord must be plugged 

into a 120 VAC outlet. Do not use an extension 

cord. Do not power 120 VAC outlet from the 

furnace blower circuit. The Automatic Humidifier 

Control must be powered from a 24 VAC source 

connected to the “R” and “C” terminals on the 

control. The 24 VAC humidifier wires (brown) 

must be connected to the “H” terminals on the 

control. 

CAUTION: Do not connect brown wires 

to “ACC” or “HUM” terminals on furnace or 

damage to the humidifier could result.

In order for the humidifier to turn on, the 

furnace blower must be operating and the 

control must be calling for humidity. The 

interface between the humidifier and the 

furnace to detect blower operation can be 

accomplished several different ways:

A.

 If the humidifier is plugged into a 

continuously powered 120 VAC outlet and  

the humidifier control “R” and “C” terminals 

receive 24 VAC from a transformer that is 

powered from the “HUM” terminals of the 

integrated furnace control board (IFC), or  

24 VAC from the low voltage terminal strip  

“W” and “B/C” of the IFC, the two brown wires 

from the humidifier can be connected directly 

to the “H” terminals on the humidifier control. 

B.

 If the humidifier is plugged into a 120 VAC 

outlet that is only powered when the furnace 

burner and blower for air distribution is in 

operation, then the humidifier control “R”  

and “C” terminals can be supplied with 

continuous 24 VAC, and the two brown wires 

from the humidifier can be connected directly 

to the “H” terminals on the humidifier control.

C.

 If the humidifier is plugged into a 

continuously powered 120 VAC outlet and the 

control is powered from a continuous 24 VAC 

source, then a Current Sensing Relay Part 

No. BAYRLY10ASENSA (not included) must 

be installed in the humidifier circuit. (Brown 

wires connected to “H” terminals on control.)

8.

 Tap into water supply line with the saddle 

valve furnished. See instructions on saddle 

valve package. The humidifier will function 

with cold, hot, softened or unsoftened water. 

The use of service hot water (140°F MAX.) 

and constant blower operation will provide 

maximum evaporative capacity. 

When 

installing humidifier on heat pump system, 

humidifier must be supplied with service  

hot water.

 

NOTE: The saddle valve is designed to be 

fully opened or closed. Do not use it to 

regulate water flow.

9.

 Connect tubing from the saddle valve to 

the inlet side of the solenoid valve using 

1

4

” 

O.D. copper tubing (not furnished).  

DOUBLE WRENCH TO PREVENT LEAKING!  

(See Figure 4)

10.

 Drain spud is designed to accept 

1

2

” I.D. 

plastic hose (not furnished). Run drain line from 

drain spud to floor drain. 

CAUTION: If hose 

clamp is used, do not overtighten, drain spud 

could crack. Be sure drain line has continuous 

slope. NOTE: Do not sweat or directly attach 

metal drain line to fitting. Do not use solvent 

type adhesives when connecting plastic drain 

line, since damage to fitting could result.

11.

 Open saddle valve completely and turn 

on furnace. Turn up humidifier control so that 

humidifier will turn on. Allow humidifier to run 

until water is observed coming out of the drain 

line. Check to see if humidifier and saddle valve 

are watertight. Check operation to make sure 

that all electrical components function properly 

by utilizing humidification system check-out 

section in the “Installer’s Guide/Automatic 

Humidifier Control, Form #18-CH31D1-3”. Set 

humidifier control to level recommended in 

the “Use and Care manual”.

FURNISHED ITEMS

Automatic Humidifier Control
Automatic Humidifier Control 

Installation Sheet

24 VAC Transformer

Saddle Valve

Humidifier Installation Template

Mounting screws  

(sheet metal screws)

Water supply line (1/4” copper)

Drain line (1/2” I.D. hose)

Low voltage wire

Current Sensing Relay Part No. 

BAYRLY10ASENSA (if required)

ITEMS NOT FURNISHED

IMPORTANT!

 Be sure Use and Care manual containing instructions for 

operation and warranty information is given to owner in order to avoid unnecessary 
calls. Warranty is void unless humidifier is installed by qualified heating and air 
conditioning contractor due to possible misapplication of product.

PARTS LIST

NOTE:

 BEFORE LEAVING THE 

JOB SITE, MAKE SURE:
1.  Saddle valve is fully open.
2.  All plumbing connections are 

watertight.

3.  Humidifier functions properly.

TOP

6

7

12

5

2

3

16

4

18

9

14

11

10

8

13

15

17

1

19

20

21

90-1436

  1.   Front  Cover
  2.   Base
  3. Orifice Plate
  4. Motor Mount Bridge
  5.  Scale Control Insert
  6.   Humidifier  Pad
  7. Water Distribution Tray
  8. Fan Blade
  9. Motor

 10. Motor Mount Gasket
  11. Relay
  12. Power Cord
 13. Strain Relief Bushing
  14. Solenoid Valve
  15. Connector Plug
  16. Feed Tube
  17. Nozzle
  18. Relay Connector
  19. Transformer
  20. Strainer
  21. Orifice