CAUTION
Carry out all control and handling without voltage.
As a minimum security measure in this operation, the so-called
five golden rules
should
always be followed:
1) Disconnect
2) Prevent any possible feedback
3) Check there is no voltage
4) Ground and short circuit
5) Protect from live elements, if any, and put up safety signs around the work zone.
Until these five steps are completed, the work area cannot be considered voltage-free and
any work performed will be considered to be work on live equipment.
Following is a list of the basic obligatory safety standards for each country:
- RD 614/2001 in Spain.
- CEI 11-27 in Italy.
- DIN VDE 0105-100 and DIN VDE 1000-10 in Germany.
- UTE C15-400 in France
CAUTION
Compliance with the safety instructions set out in this manual or in the suggested
legislation does not imply exemption from other specific standards for the
installation, place, country or other circumstances that affect the inverter.
CAUTION
Required to check there is no voltage:
Use Category III - 1000-Volt measuring
instruments.
Ingeteam Energy, S.A. is not liable for any damages caused by improper use of their
equipment.
Installation Manual
INGECON
®
SUN SMART TL
AAY2000IKI03
AAY2000IKI03
Rev. _
Date: March 2011
Page 5 of 64