InisBofin Insert Roomheater
Pre-firing checks
The sealing material in the flue
connections and any mortar used in
the installation will require some
time to set fully.
Before the first fire is started
in the stove, re-check all the
flueing joints for soundness,
Check that the riddler mechanism
is free and clear. Ensure that the
baffle assembly is fitted
correctly and that the facade is
fitted properly and that the
damper operates properly.
First Firing &
Commissioning
A small fire can now be started in
the stove. Use only small pieces
of kindling leaving the door ajar
taking care that the smoke is
being drawn up through the stove
and out the chimney. Maintain the
small fire for at least a half
hour to properly set the sealing
materials without cracking them
from excess heat.
If everything is correct, instruct
the user as to the operation of
the stove and advise them that the
user manual should be read
thoroughly.
Package Content
1.
Insert
: 1unit
2.
Heat resistant gloves : 1pair
3.
Instruction manual
: 1unit
4.
Wooden pallet : 1unit