5.0 MAINTENANCE
5.2 MAINTENANCE SCHEDULE
Below is our recommended maintenance schedule for each part to help ensure the safety, performance,
and longevity of your Mako Laser Cutter.
44
Guide Rails Cleaning
The guide rails, which are covered by a metal
protective cover, will occasionally need to be
cleaned and lubricated. To clean the guide rails
on the Gantry system, wipe them down with
paper towel (no solvents) and lubricate them
with a few drops of shredder performance oil.
Move the laser head back and forth several times
to ensure the oil is evenly distributed.
Guide Rails
DAILY
WEEKLY
MONTHLY
ANNUALLY
MIRROR 1
Check/Clean
MIRROR 2
Check/Clean
MIRROR 3
Check/Clean
LENS
Check/Clean
TABLE
As Needed
WATER COOLING UNIT
Check/Replace
Water
ENTIRE WORKING AREA
As Needed
BELTS
As Needed
TUBE
As Needed
LINEAR RAILS
As Needed
AIR NOZZLE
As Needed
INTERNAL MEMORY
As Needed