background image

 
 

InnoTune elektrotechnik 

Tel.: 

(+43) 676 9626882 

Sparkasse Rainbach 

Severin Elmecker 

E-Mail: 

office@innotune.at

 

IBAN AT522032016100001244 

Summerau Anger 3 

 

 

BIC ASPKAT2LXXX 

A-4261 Rainbach i.M. 

Web: 

www.innotune.at 

UID ATU68743899 

 

 

2.3 

Assembly 
 

Notice 

The following drilling plan is not on a 1: 1 scale. It must not be used as a drilling template 

be used. Please only take the specified dimensions from the drilling plan. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Requirements 

Recommended mounting height measured 1.00 m -1.20 m from the ground to the lower 

hole. After installation, the wallbox must be able to carry at least 16 kg. 

Assembly steps 

1. Mark the two mounting holes according to the drilling plan. 

2. Drill the mounting holes according to the mounting surface (e.g. dowels for masonry). 

The screw diameter may not exceed 6 mm. 

3. Screw in the upper fastening screw. 

Notice 

The fastening screws are due to possible different mounting surfaces 

to choose accordingly. Please do not necessarily use the screws provided in the scope of 

delivery. 

 

 

Summary of Contents for InnoCharge

Page 1: ...Tel 43 676 9626882 Sparkasse Rainbach Severin Elmecker E Mail office innotune at IBAN AT522032016100001244 Summerau Anger 3 BIC ASPKAT2LXXX A 4261 Rainbach i M Web www innotune at UID ATU68743899 Qui...

Page 2: ...743899 Contents 1 Technical data 3 1 1 Protective devices 3 1 2 Controls and operation 4 2 Assembly instructions 5 2 1 Requirements 5 2 2 Scope of delivery accessories 5 2 3 Assembly 6 2 4 Electrical...

Page 3: ...tricianin accordance with the national regulations Plug Type 2 Maximum amperage 25 A Kabel 5 x 2 5 mm DC protection Type B included JA User interface Modbus RTU RS485 Overvoltage category CAT III Stor...

Page 4: ...e charging cable the vehicle can start charging The blue LED lights up during the charging process When the vehicle finishes charging the wallbox completes the charging process The green and red LEDs...

Page 5: ...expose the wallbox to direct sunlight as this can cause it to overheat The individual phases of the supply voltage must be protected with residual current devices and circuit breakers No single wires...

Page 6: ...e drilling plan Requirements Recommended mounting height measured 1 00 m 1 20 m from the ground to the lower hole After installation the wallbox must be able to carry at least 16 kg Assembly steps 1 M...

Page 7: ...ent In the event of damage caused by a missing or incorrect assessment InnoTune Elektrotechnik disclaims liability 2 5 Approval by your RU We would like to point out that this product is subject to an...

Page 8: ...4 PP proximity plug 5 K201 Welding detection 1 GND 2 WELD 6 K400 RS458 1 RS485B 2 GND 3 RS485A 7 K401 Open drain Connection ECO mode 1 relay in 2 relay out 8 K202 DC RCM 1 GND 2 12V 3 RCM test 4 RCM f...

Page 9: ...OLDING REGISTER 0x03 Adresse Parameter Datenformat 0 EVSE Status 1 Ready 2 Connected 3 Charging integer 16 Bit 1 Actual Modbus ID default 1 integer 16 Bit 2 Installed Amps Read from rotary switch inte...

Page 10: ...Elmecker Summerau Anger 3 4261 Rainbach AUSTRIA 4 Environment This device is used to charge electrically powered vehicles and is subject to EU Directive 2012 19 EU on waste electrical and electronic e...

Page 11: ...chnik Tel 43 676 9626882 Sparkasse Rainbach Severin Elmecker E Mail office innotune at IBAN AT522032016100001244 Summerau Anger 3 BIC ASPKAT2LXXX A 4261 Rainbach i M Web www innotune at UID ATU6874389...

Reviews: