Page 10
VoIP gateway IP400 version 5.01
2.1.4 Commissioning and Installation of the IP 400
The following steps are required to commission the gateway:
• Wire up the connections as described above.
• Set the IP- interface parameters, see section 2.2 “Configuration of access to
the local network” from page 11.
• To define the operational configuration, see section 4 “Configuration of the IP
interfaces” from page 24.
The following sections are based on the assumption that the gateway is in the
same condition as delivered and that therefore the standard configuration is
loaded. We recommend restoring the standard configuration first, if you are not
sure about the state of the configuration (see section 2.2.1 “Generating the stand-
ard configuration” from page 11).
Note the section “Safety instructions for the IP 400” from page 138.
The IP 400 is suitable for wall mounting. The horizontal distance between the sus-
pension points is 12 cm. Take care not to damage the protective film of the PCB
when mounting the IP 400.
The devices can be stacked. Make sure there is adequate ventilation if the gate-
way is to be installed in a cabinet.
For installation in a 19" cabinet, there is a special frame available which can
accommodate two IP 400 gateways.