User Manual
–
NV200 Spectral
Copyright © Innovative Technology Ltd 2019
Doc: User Manual NV200 Spectral
Version: 2.1
Page 42 of
95
Once the file has been selected its information will be populated and the Program
device tab will become active. Finally,
hit ‘Program Device’, the unit’s bezel will now
begin to flash signaling the update has begun.
Caution!
Interrupting the download process can result in
the unit entering a non-functional state, once the
process has started it cannot be halted.
When completed the unit will restart and a pop-up box will appear saying Device
Programming Complete.
5.4.2
SD Card
5.4.2.1
General Description
The NV200 Spectral can also be reprogrammed through the SD slot on the front of
the unit. To do this the SD card must be correctly formatted and meet the hardware
requirements defined in
5.4.2.2
Hardware Requirements
The SD card must meet the following hardware requirements:
Minimum: 4GB
–
Class 4
Maximum: 32GB
–
Class 10
The following SD card has been tested and recommended for best performance:
https://www.sandisk.co.uk/home/memory-cards/sd-cards/ultra-sd
5.4.2.3
Re-programming via SD Card
Follow the steps below to set up the SD card and perform the update:
1) Connect the SD card to your PC using an SD card reader.
2) Ensure that the card is FAT-32 formatted and is blank.
3) Create a folder on the SD card called nv200hs.
This must be
lowercase
4) Inside the folder, place the dataset file that you want to load on to the
validator. Datasets can be downloaded from the
or requested from our support team:
support@innovative-technology.co.uk
5) Ensure the NV200 Spectral is powered on and has booted up
6) Insert the SD card into the slot on the front. The bezel will now start flashing.
Do not unplug the validator during the update process.
7) Wait until the bezel lights solid green. When it does, the SD card can be
removed.
8) After the SD card has been removed, the unit will reboot. This takes around
10 seconds. Once it has rebooted the NV200 Spectral will have the new
dataset on it and is ready to be used.
If there are modules attached
(Payout/Ticket/TEBS) these will then be updated by the NV200
Spectral, do not unplug the unit during these updates.