27
Fig. 24
8. After the job done
After the job done disconnect the PTO shaft, lift the machine and
transport it onto the appropriate place.
During transport reduce the speed, especially on bumpy
roads. The weight of the machine may render driving
difficult and damage the machine itself. During transport
the machine must be always in the transport position.
PTO shaft must be disconnected during transport.
At disconnecting the machine respect the warning rules
for connecting the machine.
Before disconnection of the machine put on a pin
(Fig.25/2)
Check the condition of the rotor shaft, working blades and if
they are tightened well (bolts, nuts).
1
φ
max
=20°
Summary of Contents for MKM
Page 33: ...33 Fig 33 Fig 34 Fig 37 Fig 38 1 Fig 34 6 Fig 35 Fig 36 Fig 38 2 5 9 4 10 7 8 3 1 2 ...
Page 38: ...38 A ...
Page 39: ...39 B ...