www.insigniarange.com
Last Modified 08/02/2018
12
Step 1
You will have three back panels in three separate boxes. The panel with the control panel on is always the central panel. You will notice in the tray at the back there will
be a round hole, which is for the hose going from the steam generator to the waste.
Connect two of the back panels, as shown in the image.
Ensure that you insert the T
-
Strips between the left and centre panel and run a bead of silicone in the
‘
T
’
on
either side (
red vertical line
).
Secure into position using the
B28/N10/BW12
bolts, washers and hex nuts as shown in the image below at all four points.
Place on tray to align but
do not
RubberGum or screw together yet.