FUNCTIONAL TRAINER ASSEMBLY INSTRUCTIONS
STEP 1 (See Diagram 1)
A.) Do not tighten the Nuts and Bolts until instructed to do so.
B.) Place the Lower Cross Brace (#4) between the Right & Left
Stations (#1 & #2) in the mid-span.
C.) Attach one end of the Lower Cross Brace to the Right Station.
Secure it with two M10 x 2 ¾ ” Allen Bolts (#42), four Ø 1” Washers
(#50), and two M10 Aircraft Nuts (#48). Repeat the same
procedure to install the other side.
D.) Repeat Procedure B & C to install the Upper Cross Brace (#5).
E.) Place the Upper Frame (#3) on top of the Right and Left Stations.
F.) Secure each end with two M10 x 1” Allen Bolts (#43), two Ø ¾ ”
Lock Washers (#47), and
Ø 1” Washers (#50). G.) Securely tighten all Nuts and Bolts
installed
PAGE 5
6/2011
Summary of Contents for FT1
Page 5: ...HARDWARE SIZING CHART PAGE 4 6 2011 ...
Page 7: ...Diagram 1 PAGE 6 6 2011 ...
Page 9: ...Diagram 2 PAGE 8 6 2011 ...
Page 11: ...Diagram 3 PAGE 10 6 2011 ...
Page 13: ...Diagram 4 PAGE 12 6 2011 ...
Page 15: ...Diagram 5 PAGE 14 6 2011 ...
Page 17: ...Diagram 6 PAGE 16 6 2011 ...
Page 18: ...PAGE 17 6 2011 ...