PAGE 8
Step 5
Attach the Top Beam (8) to the Main Upright (7) using 1-M10 bolts (19) and 1-M10
A
lock washer (28).
Attach the Top Beam (8) to the Left & Right Upright Tubes (5, 6) using 6-M10 bolts
B
(24), 12-M10 washers (27), and 6-M10 Hex nuts (29).
Tighten all hardware from steps 1-5.
C
5
6
8
24
27
29
19
28
7
Summary of Contents for VKR1
Page 6: ......
Page 18: ...Page 15 DECAL REFERENCE...