10
Insert the Front Post (2) onto the tube of the Main Frame (1) and secure with six M8x15 Bolts (91), six
Ø20xØ8x2.0 Big Curve Washers (43) that were removed. Tighten bolts and washers with the S6 Allen Wrench
provided.
Remove the Ø5Curve Washer for Tension Control Knob (39) and M5x45 Bolt for Tension Control Knob (38)
from the Tension Control Knob (40). Remove bolt and curve washer with the Multi Hex Tool with Phillips
Screwdriver provided.
Put the cable end of resistance cable of Tension Control Knob (40) into the spring hook of Tension Cable (84) as
shown in drawing A of figure 2. Pull the resistance cable of Tension Control Knob (40) up and force it into the
gap of metal bracket of Tension Cable (84) as shown in drawing B of figure 2. Attach the Tension Control Knob
(40) onto the Front Post (2) with the Ø5Curve Washer for Tension Control Knob (39) and M5x45 Bolt for
Tension Control Knob (38) that were removed. Tighten bolt curve washer with the Multi Hex Tool with Phillips
Screwdriver provided.
STEP 3: Left/Right Handrail Arms, Left/Right Foot Bars, Left/Right Foot Pedals, and
Foot Bar Covers-A/B Installation
Remove two M10x18 Bolts (32), two Ø10 Spring Washers (33), two Ø10xØ20x2.0 Big Washers (95), and two
Ø28x5 Washers (35) from the left and right horizontal axes of the Front Post (2).
Attach the Left Handrail Arm (3) onto the left horizontal axis of the Front Post (2) with one M10x18 Bolt (32),
one Ø10 Spring Washer (33), one Ø10xØ20x2.0 Big Washer (95), and one Ø28x5 Washer (35) that were
removed.
Attach the left U Shape Bracket (10) to the left Crank (12) with one 1/2” Bolt for left U Shape Bracket (52),
Ø28xØ17x0.3 Wave Washer (53), Ø13xØ20x2 Spring Washer (54), and 1/2” Left Nylon Nut (55). Install a S13
Cap (59) onto the M8x50 Bolt (58).
NOTE: 1/2” Bolt for left U Shape Bracket (52) and 1/2” Bolt for U Shape Bracket (93) are marked “R” for
Right and “L” for Left.