10
Step 2
•
Make sure that communication lines are connected correctly, in case they are connected in
reverse.
•
Put meter on the meter tube. Use 6 pcs of Screw M8*15 with 6 pcs of washer to solid the
meter. (Don’t fasten screw at first)
•
After the machine is power on,
push “Start”, if everything goes well, then fasten screws
mentioned in front steps.
Step 3
•
Use 4 pcs of Screw M8*15 with 4 pcs of washer to solid it
. (Don’t fasten screw at first).