Instant Promotion
(UK) Ltd
Unit 7, Liberty Industrial Park, South Liberty Lane, Bristol, BS3 2SU | Tel: 0117 963 1668 | www.instantpromotion.co.uk
01
02
03
04
05
06
07
08
09
10
11
12
For more detailed instructions on how to use the pump, please refer to page 3.
Unzip and fold away all the walls.
Remove the weight plates from the zip pockets
in the two front legs.
Open the valve cap and push the spring button
in the centre to open the valve.
With a person on each of the two front legs,
sweep them under the spider dome so that the
unit falls into a semi-circular position.
Remove the remaining weight plates from the
zip pockets in the two back legs.
Set the pump to the deflate setting with the
inflate/deflate nozzle attached.
Insert the nozzle and turn the pump on to
extract as much of the remaining air from the
unit as possible, then turn off the pump and
close the valve.
Manoeuvre both persons to lift and fold over
two legs.
All four legs should now be placed on top of
each other.
Roll from the top of the dome down towards
the feet. You can then open the valve to pump
out any remaining air if needed.
Slide the rolled up spider dome into the bag and
add any walls & accessories.
Zip up the bag and remove the groundsheet
(store separately). If the spider dome is still
damp when packed away, please ensure it is
dried at room temperature within 48hrs.
01.
02.
03.
04.
05.
06.
07.
08
09.
10.
11.
12.
Spider Dome Pro Take Down Guide