Page 14 of 38
SPAN 500 BRIDGED TOWER
8. Install stabilisers as shown. Position the lower
clamp so that the lower arm is as close to
horizontal as possible. Adjust the length of the leg
when using telescopic stabilisers. Ensure
stabiliser foot has a firm contact with the ground.
9. Repeat steps 1-8 for the second tower structure and position as shown.