Page 20 of 38
SPAN 500 BRIDGED TOWER
19. Install the spandeck posts and handrail while the spandeck is on the ground. Adjust the Spandeck
guardrail posts to have centre distance of 450mm below top coupler. Slide the pin up the tube to
allow for installation.
20. Mount the required number of Spandeck guardrail posts to the side of the spandeck. Do the same
for the opposite side of Spandeck.
21. Slide the locking pin into the designated hole of the Spandeck, positively locking the post into
position.
22. Remove the spandeck handrails from the base and install them to the guardrail posts.