Page 28 of 38
SPAN 500 BRIDGED TOWER
10. Install stabilisers as shown. Position the lower clamp
so that the lower arm is as close to horizontal as
possible. Adjust the length of the leg when using
telescopic stabilisers. Ensure stabiliser foot has a
firm contact with the ground.
11. Repeat steps 1-10 for the second tower structure and position as shown.