Page 33 of 38
SPAN 500 BRIDGED TOWER
Over an obstruction:
•
If the spandeck cannot be hoisted up between the towers there are some alternative options;
o
Install spandeck as instructed in 6m build sequence and move tower into place.
o
Rope the spandeck from the side of the towers.
ALTERNATIVE BUILDS