Page 34 of 38
SPAN 500 BRIDGED TOWER
Using a single Spandeck
•
Assemble both towers as described in previous build sequences.
•
Install the walk-through frames ensuring that the frame openings are positioned on the
same side as shown below.
•
Install the trapdoor and non-trapdoor platforms on the 4th rung above the platform below.
Note the orientation of the trapdoors.
•
Using the 3T method, install the horizontal braces on the vertical tube as shown on both
towers.